Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
66hours of spills in 2025 between them (typical neighbourhood: about 36)
25spill events counted
Severn Trent Water
Armthorpe Sewage Treatment Worksinto Tributary Of The Fores Drain19 spills, 61 hours in 2025
1.7 km away
Severn Trent Water
Armthorpe - Cowthorpe Lane Csointo Tributary Of Diggin Dyke6 spills, 5 hours in 2025
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Battery storage
Cutts Bros, Wharf Road - Battery Storage FacilityApproved, not yet built · 50 MW
Oct 2024 4.8 km away
Battery storage
Fordtead Lane, Thorpe Marsh - Battery Energy FacilityApproved, not yet built · 180 MW
Apr 2024 5.5 km away
Running nearest: Next Distribution Centre Doncaster (rooftop solar, 1.8 km); Ikea Distribution Centre (rooftop solar, 2.1 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 5.4 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 5.4 km); Trackwork Limited (EfW) (energy from waste, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 20.9 km away
Decided
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
decided Dec 2022 21.2 km away
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.