What's changing near DN33 3HF
Within 2 km, around Scartho in North East Lincolnshire. Building, planning, schools, transport, prices and crime.
453new homes completed within 2 km, last 2 years
9homes given permission on brownfield sites since 2021
-0.2%like-for-like prices in Scartho, 2024 → 2025 (council +0.9%)
+16%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
15 new homes completedhouses · Feb 2026 – Oct 2026
Oct 2026
550 m away - New homes
30 new homes completedhouses · Apr 2026 – Oct 2026
Oct 2026
950 m away - New homes
27 new homes completedhouses · Aug 2025 – Sep 2026
Sept 2026
900 m away - New homes
33 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
1.2 km away - New homes
36 new homes completedhouses · May 2025 – Sep 2026
Sept 2026
700 m away - New homes
8 new homes completedhouses · Aug 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
12 new homes completedhouses · Oct 2024 – Aug 2026
Aug 2026
1.6 km away - New homes
12 new homes completedhouses · Oct 2025 – Aug 2026
Aug 2026
600 m away - New homes
20 new homes completedhouses · Jun 2025 – Jul 2026
Jul 2026
750 m away - New homes
16 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
1.6 km away - New homes
58 new homes completedhouses · Oct 2024 – Jun 2026
Jun 2026
800 m away - New homes
6 new homes completedflats · May 2025 – Jun 2026
Jun 2026
1.1 km away
4homes extended 2021–2025, typically adding 35 m²
8since energy certificates began (2008)
0in DN33 3HF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 8 running (74 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Diana Princess Of Wales Hospital - Solar PanelsApproved, not yet built · 810 kW
Feb 2026
1.7 km away - Solar farm
Bradley Road - Solar FarmApproved, not yet built · 44 MW
Apr 2024
2.1 km away - Battery storage
Bradley Road - Battery Energy Storage SystemApproved, not yet built · 10 MW
Apr 2024
2.1 km away - Rooftop solar
Oasis Academy WintringhamApproved, not yet built · 200 kW
Mar 2020
2.6 km away - Rooftop solar
Grimsby Institute, Laceby Road - Solar PanelsApproved, not yet built · 190 kW
Nov 2022
2.7 km away - Rooftop solar
Hilmore Road, Laceby - Photovoltaic Solar SystemApproved, not yet built · 450 kW
May 2022
3.2 km away - Solar farm
Weelsby Pumping Station, Hewitts Avenue - Solar PanelsApproved, not yet built · 380 kW
Apr 2023
3.5 km away - Solar farm
Manor Golf Course, Barton Street - Solar PanelsApproved, not yet built
Sept 2024
3.7 km away - Rooftop solar
Freshney Green Primary Care Centre, Sorrel Road - Solar panelsApproved, not yet built · 190 kW
May 2024
3.8 km away - Battery storage
Hewitts Avenue, New Waltham - Battery StorageApproved, not yet built · 50 MW
Mar 2025
3.8 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Viking CCS Pipeline Other Pipe-lines · From land south of VPI Immingham Power Plant to the Theddlethorpe Gas Terminal decided Apr 2025
5.2 km away - Pre-applicationapplication due July 2027
8.0 km away - Decideddecided Nov 2021
8.4 km away - Decideddecided Feb 2025
10.8 km away - Decideddecided Oct 2024
11.2 km away - Decided
VPI Immingham OCGTGenerating Stations · Site at and adjacent to the existing VPI Immingham Power Station, Rosper Road, Immingham DN40 3DZ decided Aug 2020
15.0 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Low Farm Solar Array (solar farm, 1.9 km); Laceby Solar Farm (solar farm, 2.8 km); Hewitts Avenue Tesco (rooftop solar, 4.0 km); Grimsby West, Birchin Way - Solar Array (rooftop solar, 5.0 km); HSH Coldstores, Estate Road - Solar Panels (rooftop solar, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.