Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
1hours of spills in 2025 between them (typical neighbourhood: about 36)
1spill events counted
Yorkshire Water
Thorne Road Csointo River Don1 spills, 1 hours in 2025
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
application due October 2026 16.8 km away
Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 20.6 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Intake: +40% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.
Morris & Co Handlers, Balby Carr Bank - Solar PanelsApproved, not yet built · 640 kW
Apr 2023 3.7 km away
Rooftop solar
Morris And Co Handlers, Balby Carr Bank - Solar Pv PanelsApproved, not yet built · 270 kW
Jan 2024 3.7 km away
Running nearest: Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 3.3 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 3.3 km); Next Distribution Centre Doncaster (rooftop solar, 3.9 km); Ikea Distribution Centre (rooftop solar, 4.1 km); Trackwork Limited (EfW) (energy from waste, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
decided Dec 2022 23.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.