Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
60hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
Yorkshire Water
Bellevue Spsinto The Lady Bank Drain4 spills, 33 hours in 2025
1.6 km away
Yorkshire Water
Bellevue Spsinto The Lady Bank Drain6 spills, 26 hours in 2025
1.6 km away
Yorkshire Water
Thorne Road Csointo River Don1 spills, 1 hours in 2025
1.6 km away
Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database0 spills, 0 hours in 2025
2.0 km away
Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database0 spills, 0 hours in 2025
2.0 km away
Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database0 spills, 0 hours in 2025
2.0 km away
Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database0 spills, 0 hours in 2025
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
application due October 2026 17.0 km away
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 202620.2 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Intake: +40% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.
Helios Renewable Energy ProjectGenerating Stations · Land to the south west of the village of Camblesforth and to the north of the village of Hirst Court
decided Dec 2025 23.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.