What's changing near DN2 5DG
Within 2 km, around Belle Vue & Town Fields in Doncaster. Building, planning, schools, transport, prices and crime.
207new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.5%like-for-like prices in Belle Vue & Town Fields, 2024 → 2025 (council +3.7%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedhouses · Jun 2025 – Oct 2026
planned Oct 2026
1.7 km away - New homes
17 new homes completedhouses · Jun 2025 – Sep 2026
Sept 2026
1.6 km away - New homes
11 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
2.0 km away - New homes
5 new homes completed4 flats, 1 houses · Jul 2026
Jul 2026
1.4 km away - New homes
10 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.8 km away - New homes
20 new homes completedflats · Oct 2025
Oct 2025
1.4 km away - New homes
18 new homes completedflats · Sep 2025
Sept 2025
1.6 km away - New homes
14 new homes completedflats · Jul 2025
Jul 2025
1.2 km away - New homes
50 new homes completedhouses · Jan 2025 – Jun 2025
Jun 2025
2.0 km away - New homes
26 new homes completedflats · Feb 2025
Feb 2025
1.2 km away - New school
New school: Doncaster UTCUniversity technical college, secondary
Sept 2020
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
12homes extended 2021–2025, typically adding 27 m²
26since energy certificates began (2008)
0in DN2 5DG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
607hours of spills in 2025 between them (typical neighbourhood: about 36)
70spill events counted
- Yorkshire Water
Bentley Sewage Treatment Worksinto Bentley Mill Stream40 spills, 459 hours in 2025
1.9 km away - Yorkshire Water
Doncaster Interchange Csointo Culverted River Cheswold10 spills, 45 hours in 2025
1.8 km away - Yorkshire Water
Wheatly/No 2 Spsinto An Unnamed Trib Shef & Sy Navi9 spills, 44 hours in 2025
1.4 km away - Yorkshire Water
Bellevue Spsinto The Lady Bank Drain4 spills, 33 hours in 2025
1.3 km away - Yorkshire Water
Bellevue Spsinto The Lady Bank Drain6 spills, 26 hours in 2025
1.3 km away - Yorkshire Water
Thorne Road Csointo River Don1 spills, 1 hours in 2025
1.7 km away - Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database0 spills, 0 hours in 2025
1.4 km away - Yorkshire Water
Not Matched In Ea Consents Databaseinto Not Matched In Ea Consents Database0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 9 running (25 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Premier Logistics Park, Churchill Road - Solar PV PanelsApproved, not yet built
Feb 2026
1.3 km away - Battery storage
Cutts Bros, Wharf Road - Battery Storage FacilityApproved, not yet built · 50 MW
Oct 2024
1.4 km away - Battery storage
J3 Business Park - Battery Storage FacilityApproved, not yet built · 16 MW
Jul 2023
2.7 km away - Battery storage
J3 Business Park - Battery Energy Storage FacilityBeing built · 10 MW
Apr 2024
2.7 km away - Rooftop solar
Morris & Co Handlers, Balby Carr Bank - Solar PanelsApproved, not yet built · 640 kW
Apr 2023
2.7 km away - Rooftop solar
Morris And Co Handlers, Balby Carr Bank - Solar Pv PanelsApproved, not yet built · 270 kW
Jan 2024
2.7 km away - Rooftop solar
Sainsburys, Thorne Road - Solar PanelsApproved, not yet built · 550 kW
May 2026
3.2 km away - Rooftop solar
Aggreko UK, Sandall Stones Road - Solar PVApproved, not yet built · 230 kW
Jul 2025
4.1 km away - Battery storage
Aggreko UK, Sandall Stones Road - Battery Energy StorageApproved, not yet built
Jul 2025
4.1 km away - Rooftop solar
Iport Avenue, New Rossington Solar PanelsApproved, not yet built · 2 MW
Mar 2021
4.4 km away
Road and street works within 1 km
5 permitted works running now or planned, 3 of them major.
- Major
Town Moor Avenue, DoncasterHighway improvement works · DONCASTER METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Aug 2026 to Oct 2026
550 m away - Major, planned
Bawtry Road, DoncasterHighway improvement works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Lane closure
Sept 2026 to Dec 2026
900 m away - Major
Bawtry Road, DoncasterHighway improvement works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Lane closure
Oct 2026 to Oct 2026
900 m away - Standard
Bennethorpe Service Road, DoncasterDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Oct 2026
700 m away - Standard
Winton Road, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2012
7.0 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
12.9 km away - Decideddecided Mar 2016
15.2 km away - Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal application due July 2025
15.5 km away - Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire. application due October 2026
17.9 km away - Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 202619.7 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 2.2 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 2.2 km); Next Distribution Centre Doncaster (rooftop solar, 5.3 km); Ikea Distribution Centre (rooftop solar, 5.5 km); Trackwork Limited (EfW) (energy from waste, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.