What's changing near DN2 5AN
Within 2 km, around Wheatley Hills in Doncaster. Building, planning, schools, transport, prices and crime.
260new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.7%like-for-like prices in Wheatley Hills, 2024 → 2025 (council +3.7%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
49 new homes completedhouses · Mar 2025 – Oct 2026
Oct 2026
1.2 km away - New homes
14 new homes completedhouses · Jul 2026 – Oct 2026
Oct 2026
1.4 km away - New homes
11 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.1 km away - New homes
16 new homes completedhouses · Oct 2025 – Sep 2026
Sept 2026
1.4 km away - New homes
14 new homes completedhouses · Dec 2025 – Jul 2026
Jul 2026
1.3 km away - New homes
15 new homes completedhouses · Mar 2026 – Jun 2026
Jun 2026
1.4 km away - New homes
9 new homes completedhouses · Oct 2025 – Jun 2026
Jun 2026
1.3 km away - New homes
35 new homes completedhouses · May 2025 – Apr 2026
Apr 2026
1.3 km away - New homes
20 new homes completedhouses · Sep 2025 – Mar 2026
Mar 2026
1.4 km away - New homes
14 new homes completedhouses · Jul 2025 – Mar 2026
Mar 2026
1.1 km away - New homes
50 new homes completedhouses · Jan 2025 – Jun 2025
Jun 2025
950 m away - New homes
8 new homes completedflats · Jun 2025
Jun 2025
2.0 km away
7homes extended 2021–2025, typically adding 27 m²
18since energy certificates began (2008)
0in DN2 5AN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
153hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
- Yorkshire Water
Sandall Wwtwinto R. Don & R. Don (Old Course)15 spills, 150 hours in 2025
850 m away - Yorkshire Water
Boundary Avenue Combined Sewer Overflow into Not Matched In Ea Consents Database7 spills, 3 hours in 2025
850 m away - Yorkshire Water
Thorne Road Csointo River Don1 spills, 1 hours in 2025
550 m away - Yorkshire Water
Harrowden Csointo Drain Leading To The River Don0 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
33 planned, approved or being built and 11 running (31 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys, Thorne Road - Solar PanelsApproved, not yet built · 550 kW
May 2026
1.2 km away - Rooftop solar
Aggreko UK, Sandall Stones Road - Solar PVApproved, not yet built · 230 kW
Jul 2025
1.9 km away - Battery storage
Aggreko UK, Sandall Stones Road - Battery Energy StorageApproved, not yet built
Jul 2025
1.9 km away - Energy from waste
BH Energy Gap - Energy Recovery FacilityApproved, not yet built · 34 MW
Aug 2022
2.3 km away - Rooftop solar
Premier Logistics Park, Churchill Road - Solar PV PanelsApproved, not yet built
Feb 2026
2.4 km away - Battery storage
Cutts Bros, Wharf Road - Battery Storage FacilityApproved, not yet built · 50 MW
Oct 2024
2.6 km away - Battery storage
Fordtead Lane, Thorpe Marsh - Battery Energy FacilityApproved, not yet built · 180 MW
Apr 2024
3.0 km away - Rooftop solar
Haith Group Limited, Cow House Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2023
3.2 km away - Solar farm
The Balk, Almholme - Solar FarmApproved, not yet built · 50 MW
Oct 2024
3.8 km away - Battery storage
The Balk, Almholme - Energy Storage SystemApproved, not yet built · 1,025 MW
Oct 2024
3.8 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2012
5.4 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
10.9 km away - Decideddecided Mar 2016
13.1 km away - Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal application due July 2025
13.4 km away - Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire. application due October 2026
17.7 km away - Decided
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire decided Sept 2018
19.1 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 3.0 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 3.0 km); Next Distribution Centre Doncaster (rooftop solar, 4.0 km); Ikea Distribution Centre (rooftop solar, 4.1 km); Trackwork Limited (EfW) (energy from waste, 4.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.