Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
925hours of spills in 2025 between them (typical neighbourhood: about 36)
51spill events counted
Severn Trent Water
Crowle-Scunthorpe Stwinto Tributary Of Pauper¿S Drain51 spills, 925 hours in 2025
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
decided Dec 2022 5.2 km away
Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
Project Union: East CoastOther Pipe-lines · East Coast of England from Teesside in the north passing through North Yorkshire and the Humber region and Lincolnshire, extending into the East Midlands. Key areas of new build pipeline would be around Teesside, the Humber region and the East Midlands.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Crowle & Keadby: +28% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due December 2028 15.9 km away
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
application due October 2026 16.8 km away
Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
decided Feb 2026 17.0 km away
Decided
Little Crow Solar ParkGenerating Stations · Land located 0.6km to the east of the British Steel site at Scunthorpe, North Lincolnshire, DN16 1XP
decided Apr 2022 17.1 km away
Decided
Drax Re-powerGenerating Stations · Drax Power Station, Drax YO8 8PH, North Yorkshire
decided Oct 2019 17.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.