Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
decided Dec 2022 4.0 km away
Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Project Union: East CoastOther Pipe-lines · East Coast of England from Teesside in the north passing through North Yorkshire and the Humber region and Lincolnshire, extending into the East Midlands. Key areas of new build pipeline would be around Teesside, the Humber region and the East Midlands.
application due December 2028 18.1 km away
Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
decided Feb 2026 18.5 km away
Decided
Drax Re-powerGenerating Stations · Drax Power Station, Drax YO8 8PH, North Yorkshire
decided Oct 2019 20.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.