Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
263hours of spills in 2025 between them (typical neighbourhood: about 36)
64spill events counted
Severn Trent Water
Woodgarr Avenue Storm Overflowinto Three Rivers35 spills, 157 hours in 2025
200 m away
Severn Trent Water
Doncaster Road Pumping Stationinto Gunness South Drain15 spills, 92 hours in 2025
1.2 km away
Severn Trent Water
Althorpe Stwinto River Trent & New Idle River6 spills, 11 hours in 2025
450 m away
Yorkshire Water
Lyme Terrace Csointo Old Ea Beck8 spills, 3 hours in 2025
1.6 km away
Severn Trent Water
Scunthorpe-Gunness-71a Station Rd (Cso)into Soak Mere Drain0 spills, 0 hours in 2025
950 m away
Severn Trent Water
Gunness Sewage Treatment Worksinto River Trent0 spills, 0 hours in 2025
26 planned, approved or being built and 6 running (114 MW between them). Those within 5 km are on the map above.
Battery storage
Chapel Lane - Energy storage facilityApproved, not yet built
Jan 2024 700 m away
Solar farm
Pilfrey Solar Farm - Solar FarmPlanning application in · 50 MW
Aug 2025 2.6 km away
Solar farm
North Moor Farm, Keadby - Solar PanelsPlanning application in · 50 MW
Aug 2025 2.6 km away
Energy from waste
North Lincolnshire Green Energy ParkApproved, not yet built · 95 MW
Mar 2025 4.2 km away
Battery storage
North Lincolnshire Green Energy ParkApproved, not yet built · 30 MW
Mar 2025 4.2 km away
Hydrogen
North Lincolnshire Green Energy ParkApproved, not yet built · 10 MW
Mar 2025 4.2 km away
Rooftop solar
The Range, Holyrood Drive - Solar PanelsApproved, not yet built · 300 kW
Apr 2026 4.7 km away
Rooftop solar
Church Lane - Solar CanopyApproved, not yet built · 1 MW
May 2025 4.7 km away
Rooftop solar
Scunthorpe General Hospital, Cliff Gardens - Solar PanelsPlanning application in · 150 kW
Sept 2025 4.8 km away
Solar farm
Scunthorpe General Hospital, Cliff Gardens - Solar CanopyApproved, not yet built · 210 kW
Jan 2026 4.8 km away
Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
Keadby 3 Carbon Capture Power StationGenerating Stations · Land at the Keadby Power Station Site, Trentside, Keadby, Scunthorpe, Lincolnshire, DN17 3EF
Little Crow Solar ParkGenerating Stations · Land located 0.6km to the east of the British Steel site at Scunthorpe, North Lincolnshire, DN16 1XP
decided Apr 2022 10.7 km away
Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
application due July 2025 12.2 km away
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Crowle & Keadby: +28% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due October 2026 16.8 km away
Pre-application
Humber Carbon Capture PipelineOther Pipe-lines · Linear route extending from Drax (North Yorkshire) to Easington (East Riding of Yorkshire).
application due February 2027 20.3 km away
Pre-application
Project Union: East CoastOther Pipe-lines · East Coast of England from Teesside in the north passing through North Yorkshire and the Humber region and Lincolnshire, extending into the East Midlands. Key areas of new build pipeline would be around Teesside, the Humber region and the East Midlands.
East Yorkshire Solar FarmGenerating Stations · East Yorkshire Solar Farm located approximately 1.4 kilometres (km) north-west of Howden.
decided May 2025 23.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.