Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
506hours of spills in 2025 between them (typical neighbourhood: about 36)
38 planned, approved or being built and 7 running (69 MW between them). Those within 5 km are on the map above.
Rooftop solar
De Warenne Academy, Gardens Lane - Solar panelsApproved, not yet built · 240 kW
Dec 2025 1.4 km away
Rooftop solar
Eland House, Denaby - Solar PanelsPlanning application in · 330 kW
Apr 2022 3.0 km away
Rooftop solar
Red House Farm, High Melton - Red House Solar PanelsApproved, not yet built · 150 kW
Sept 2021 3.4 km away
Solar farm
Doncaster Road, Doncaster Road - Solar ArrayApproved, not yet built · 1 MW
Jun 2023 3.4 km away
Solar farm
Firsby Lane, Hooton Roberts - Solar PanelsPlanning application in · 14 MW
May 2026 3.4 km away
Rooftop solar
Red House Farm, High Melton -Solar PanelsApproved, not yet built · 160 kW
Sept 2022 3.4 km away
Solar farm
Mere Flats Solar FarmApproved, not yet built · 56 MW
May 2023 4.9 km away
Battery storage
Mere Flats Solar FarmPlanning application in · 16 MW
Aug 2022 4.9 km away
Biomass
Church View Barn, Loversall Farm - Biomass BoilerApproved, not yet built · 370 kW
May 2025 5.3 km away
Battery storage
J3 Business Park - Battery Energy Storage FacilityBeing built · 10 MW
Apr 2024 6.3 km away
Battery storage
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
Major
Butterbusk, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away
Major
Archers Way, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
application due October 2026 23.5 km away
Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
application due July 202523.9 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Cadeby, Hickleton & Hampole: +29% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.6% in two years.
Eggborough CCGTGenerating Stations · Near Eggborough village, Selby District, North Yorkshire
decided Sept 2018 26.1 km away
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 26.2 km away
Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 26.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.