What's changing near DN11 0TT
Within 2 km, around New Rossington in Doncaster. Building, planning, schools, transport, prices and crime.
262new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.6%like-for-like prices in New Rossington, 2024 → 2025 (council +3.7%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
36 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
300 m away - New homes
7 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.6 km away - New homes
37 new homes completed7 flats, 30 houses · May 2026 – Aug 2026
Aug 2026
400 m away - New homes
9 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
300 m away - New homes
28 new homes completedhouses · Mar 2025 – Aug 2026
Aug 2026
300 m away - New homes
16 new homes completed4 flats, 12 houses · Dec 2025 – Aug 2026
Aug 2026
400 m away - New homes
16 new homes completedhouses · Jan 2026 – Jun 2026
Jun 2026
400 m away - New homes
28 new homes completed4 flats, 24 houses · Nov 2025 – Apr 2026
Apr 2026
350 m away - New homes
9 new homes completedhouses · Aug 2025 – Mar 2026
Mar 2026
250 m away - New homes
33 new homes completed6 flats, 27 houses · Nov 2025 – Feb 2026
Feb 2026
250 m away - New homes
14 new homes completedhouses · Dec 2024 – May 2025
May 2025
2.0 km away - New homes
5 new homes completedhouses · Oct 2024 – Feb 2025
Feb 2025250 m away
2homes extended 2021–2025, typically adding 24 m²
3since energy certificates began (2008)
1in DN11 0TT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
25hours of spills in 2025 between them (typical neighbourhood: about 36)
5spill events counted
- Severn Trent Water
Rossington-Bankwood Lane Sps Csointo Tributary Of Rossington Drain5 spills, 25 hours in 2025
650 m away - Severn Trent Water
Rossington - Grange Lane Ps (Cso)into Ditch To Caldron Canal0 spills, 0 hours in 2025
1.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
28 planned, approved or being built and 5 running (14 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Iport Avenue, New Rossington Solar PanelsApproved, not yet built · 2 MW
Mar 2021
700 m away - Rooftop solar
Toronto Way, New Rossington Solar PanelsApproved, not yet built · 2 MW
Apr 2021
1.3 km away - Biomass
Church View Barn, Loversall Farm - Biomass BoilerApproved, not yet built · 370 kW
May 2025
2.9 km away - Rooftop solar
Morris & Co Handlers, Balby Carr Bank - Solar PanelsApproved, not yet built · 640 kW
Apr 2023
3.3 km away - Rooftop solar
Morris And Co Handlers, Balby Carr Bank - Solar Pv PanelsApproved, not yet built · 270 kW
Jan 2024
3.3 km away - Battery storage
J3 Business Park - Battery Energy Storage FacilityBeing built · 10 MW
Apr 2024
3.3 km away - Battery storage
J3 Business Park - Battery Storage FacilityApproved, not yet built · 16 MW
Jul 2023
3.3 km away - Solar farm
Partridge Hill Solar FarmApproved, not yet built · 33 MW
Jul 2016
5.6 km away - Battery storage
Cutts Bros, Wharf Road - Battery Storage FacilityApproved, not yet built · 50 MW
Oct 2024
6.2 km away - Rooftop solar
Premier Logistics Park, Churchill Road - Solar PV PanelsApproved, not yet built
Feb 2026
6.2 km away
Road and street works within 1 km
5 permitted works running now or planned, 1 of them major.
- Major
Bankwood Lane, DoncasterHighway improvement works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
600 m away - Standard
Bankwood Lane, DoncasterDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Oct 2026
550 m away - Standard
Bankwood Lane, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026
550 m away - Standard
Great Yorkshire Way, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Lane closure
Oct 2026 to Oct 2026
900 m away - Minor
Great Yorkshire Way, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · Lane closure
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2012
12.1 km away - Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire. application due October 2026
15.3 km away - Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
16.8 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
17.7 km away - Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal application due July 2025
18.1 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 6.9 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 6.9 km); Next Distribution Centre Doncaster (rooftop solar, 7.5 km); Ikea Distribution Centre (rooftop solar, 7.8 km); Misson Solar Farm (solar farm, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.