What's changing near DN11 0LE
Within 2 km, around Rossington in Doncaster. Building, planning, schools, transport, prices and crime.
7new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.7%like-for-like prices in Rossington, 2024 → 2025 (council +3.7%)
+4%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 21 m²
9since energy certificates began (2008)
0in DN11 0LE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
18 planned, approved or being built and 5 running (14 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Iport Avenue, New Rossington Solar PanelsApproved, not yet built · 2 MW
Mar 2021
3.1 km away - Solar farm
Partridge Hill Solar FarmApproved, not yet built · 33 MW
Jul 2016
3.2 km away - Rooftop solar
Toronto Way, New Rossington Solar PanelsApproved, not yet built · 2 MW
Apr 2021
3.2 km away - Biomass
Church View Barn, Loversall Farm - Biomass BoilerApproved, not yet built · 370 kW
May 2025
5.2 km away - Rooftop solar
Morris & Co Handlers, Balby Carr Bank - Solar PanelsApproved, not yet built · 640 kW
Apr 2023
5.8 km away - Rooftop solar
Morris And Co Handlers, Balby Carr Bank - Solar Pv PanelsApproved, not yet built · 270 kW
Jan 2024
5.8 km away - Battery storage
J3 Business Park - Battery Energy Storage FacilityBeing built · 10 MW
Apr 2024
5.8 km away - Battery storage
J3 Business Park - Battery Storage FacilityApproved, not yet built · 16 MW
Jul 2023
5.8 km away - Rooftop solar
Yorkshire Way, Armthorpe - Solar ArrayApproved, not yet built · 990 kW
Nov 2023
6.8 km away - Rooftop solar
Haith Group Limited, Cow House Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2023
7.7 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire. application due October 2026
13.1 km away - Decideddecided Oct 2012
13.9 km away - Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
17.6 km away - Recommendation
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal application due July 2025
18.1 km away - Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster decided Feb 2026
19.1 km away - Pre-application
STEP FusionGenerating Stations · Former West Burton A Power Station Site
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Misson Solar Farm (solar farm, 6.0 km); Next Distribution Centre Doncaster (rooftop solar, 8.0 km); Ikea Distribution Centre (rooftop solar, 8.3 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) (anaerobic digestion, 9.1 km); Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension (anaerobic digestion, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.