Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Severn Trent Water
Rossington - Grange Lane Ps (Cso)into Ditch To Caldron Canal0 spills, 0 hours in 2025
19 planned, approved or being built and 5 running (14 MW between them). Those within 5 km are on the map above.
Solar farm
Partridge Hill Solar FarmApproved, not yet built · 33 MW
Jul 2016 3.0 km away
Rooftop solar
Iport Avenue, New Rossington Solar PanelsApproved, not yet built · 2 MW
Mar 2021 3.2 km away
Rooftop solar
Toronto Way, New Rossington Solar PanelsApproved, not yet built · 2 MW
Apr 2021 3.5 km away
Biomass
Church View Barn, Loversall Farm - Biomass BoilerApproved, not yet built · 370 kW
May 2025 5.4 km away
Rooftop solar
Morris & Co Handlers, Balby Carr Bank - Solar PanelsApproved, not yet built · 640 kW
Apr 2023 5.8 km away
Rooftop solar
Morris And Co Handlers, Balby Carr Bank - Solar Pv PanelsApproved, not yet built · 270 kW
Jan 2024 5.8 km away
Battery storage
J3 Business Park - Battery Energy Storage FacilityBeing built · 10 MW
Apr 2024 5.8 km away
Battery storage
J3 Business Park - Battery Storage FacilityApproved, not yet built · 16 MW
Jul 2023 5.8 km away
Rooftop solar
Yorkshire Way, Armthorpe - Solar ArrayApproved, not yet built · 990 kW
Nov 2023 6.3 km away
Rooftop solar
Haith Group Limited, Cow House Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2023 7.2 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
Major
Station Road, DoncasterWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026 850 m away
Major
Station Road, DoncasterWorks for Rail Purposes · NETWORK RAIL · Road closure
Nov 2026 to Nov 2026 850 m away
Standard
Clay Flat Lane, DoncasterHighway repair and maintenance works · DONCASTER METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 400 m away
Minor
Station Road, DoncasterWorks for Rail Purposes · NETWORK RAIL · Two-way signals
Dec 2026 to Dec 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Tween Bridge Solar Farm Generating Stations · Land either side of the M180, High Level Banks (the A18) and the Stainforth and Keadby Canal
application due July 2025 17.6 km away
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 18.1 km away
Decided
Fenwick Solar FarmGenerating Stations · Land off Lawn Lane to the South of the River Went, Fenwick, Doncaster
decided Feb 2026 18.7 km away
Pre-application
STEP FusionGenerating Stations · Former West Burton A Power Station Site
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Rossington: +31% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.9% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.