What's changing near DL16 6RX
Within 2 km, around Tudhoe Grange in County Durham. Building, planning, schools, transport, prices and crime.
240new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+11.7%like-for-like prices in Tudhoe Grange, 2024 → 2025 (council +5.4%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
1.8 km away - New homes
9 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
1.3 km away - New homes
7 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
43 new homes completedhouses · Jan 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
13 new homes completedhouses · Dec 2025 – Aug 2026
Aug 2026
1.3 km away - New homes
29 new homes completedhouses · Dec 2024 – Aug 2026
Aug 2026
1.9 km away - New homes
59 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
2.0 km away - New homes
11 new homes completedhouses · Feb 2026
Feb 2026
1.4 km away - New homes
40 new homes completed6 flats, 34 houses · Oct 2024 – Oct 2025
Oct 2025
1.5 km away - New homes
8 new homes completedhouses · Mar 2025 – Jul 2025
Jul 2025
1.6 km away - New homes
8 new homes completedhouses · Oct 2024
Nov 2024
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 37 m²
12since energy certificates began (2008)
0in DL16 6RX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
748hours of spills in 2025 between them (typical neighbourhood: about 36)
200spill events counted
- Northumbrian Water
Tudhoe Mill Sewage Treatment Worksinto Valley Burn46 spills, 375 hours in 2025
2.0 km away - Northumbrian Water
Tudhoe Mill Sewage Treatment Worksinto Valley Burn41 spills, 169 hours in 2025
2.0 km away - Northumbrian Water
Mayfields Csointo Valley Burn44 spills, 120 hours in 2025
400 m away - Northumbrian Water
Burton Beck Csointo Burton Beck30 spills, 54 hours in 2025
800 m away - Northumbrian Water
Cow Plantation Csointo Valley Burn, River Wear14 spills, 25 hours in 2025
400 m away - Northumbrian Water
50 Oxclose Crescent Spennymoorinto Valley Burn17 spills, 3 hours in 2025
400 m away - Northumbrian Water
Attwood Terrace Cso Se008into Nicky Nack Beck8 spills, 2 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 2 running (22 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Thorn Lighting, Butchers Race - Solar PanelsApproved, not yet built · 2 MW
Aug 2024
1.6 km away - Battery storage
South Thinford Lane, Thinford - Energy StorageApproved, not yet built · 100 MW
Oct 2022
3.4 km away - Battery storage
Porch House Farm, East Street - Battery Energy Storage SystemPlanning application in
Apr 2025
3.7 km away - Solar farm
Croxdale Farms, Hett Moor Farm - Solar FarmApproved, not yet built · 50 MW
Nov 2024
3.8 km away - Battery storage
Spennymoor Greener Grid ParkApproved, not yet built · 200 MW
Jul 2025
4.5 km away - Rooftop solar
Amazon UK Services - Photovoltaic SystemApproved, not yet built · 3 MW
Apr 2022
5.5 km away - Wind farm
MME3, Plot DC1, Integra 61 - Wind TurbinePlanning application in · 2 MW
Apr 2025
5.5 km away - Rooftop solar
King James I Academy, South Church Road - Solar PanelsApproved, not yet built · 220 kW
Sept 2024
6.2 km away - Rooftop solar
Josephine Butler College Main Building, South Road - Solar PanelsApproved, not yet built
Nov 2023
6.6 km away - Solar farm
Toronto Green Energy Park, Addison Road - Solar FarmPlanning application in · 27 MW
Jan 2026
6.6 km away
Road and street works within 1 km
11 permitted works running now or planned, 5 of them major.
- Major, planned
Dickens Street, SpennymoorHighway repair and maintenance works · DURHAM COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
500 m away - Major, planned
Durham Road (Back 1-63), SpennymoorUtility asset works · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026
650 m away - Major, planned
Durham Road, SpennymoorUtility asset works · NORTHUMBRIAN WATER · Two-way signals
Oct 2026 to Oct 2026
700 m away - Major, planned
Bryan Street, SpennymoorUtility asset works · NORTHUMBRIAN WATER · Road closure
Nov 2026 to Dec 2026
800 m away - Major, planned
Marmaduke Street, SpennymoorUtility asset works · NORTHUMBRIAN WATER · Road closure
Nov 2026 to Dec 2026
800 m away - Standard
Carr Street, SpennymoorNew service connection · DURHAM COUNTY COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
Thompson Street, SpennymoorUtility asset works · NORTHUMBRIAN WATER · Give and take
Nov 2026 to Dec 2026
650 m away - Standard
Whitworth Terrace, SpennymoorUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · No carriageway incursion
Oct 2026 to Oct 2026
750 m away - Standard
Shafto Street, SpennymoorUtility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away
Major infrastructure projects within 30 km
- Decideddecided Jul 2025
15.2 km away - Decideddecided Jan 2021
23.4 km away - Decideddecided Jul 2020
27.3 km away - Decideddecided Sept 2018
27.9 km away - Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km. application due February 2027
28.2 km away - Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Chilton Energy Plant (biomass, 4.7 km); PG1-Coxhoe Waste Disposal Site (landfill gas, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.