Country England and Wales › Region North East › Council County Durham › Neighbourhood Delves Lane & Leadgate › Postcode DH8 7EF What's changing near DH8 7EF Within 2 km, around Delves Lane & Leadgate in County Durham. Building, planning, schools, transport, prices and crime.
234 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.0% like-for-like prices in Delves Lane & Leadgate, 2024 → 2025 (council +5.4%)
+36% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 34 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.2 km away New homes 30 new homes completed houses · Nov 2024 – Sep 2026
Sept 2026 1.3 km away New homes 17 new homes completed houses · Dec 2025 – Sep 2026
Sept 2026 1.2 km away New homes 7 new homes completed houses · Jun 2026 – Jul 2026
Jul 2026 1.3 km away New homes 18 new homes completed houses · Jan 2025 – Jul 2026
Jul 2026 1.5 km away New homes 32 new homes completed houses · Dec 2024 – Jun 2026
Jun 2026 800 m away New homes 38 new homes completed houses · Jan 2025 – Apr 2026
Apr 2026 1.3 km away New homes 30 new homes completed houses · Oct 2024 – Mar 2026
Mar 2026 750 m away New homes 12 new homes completed houses · Oct 2024 – May 2025
May 2025 1.2 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 31 m²
20 since energy certificates began (2008)
1 in DH8 7EF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 8 storm overflows within 2 km
522 hours of spills in 2025 between them (typical neighbourhood: about 36)
178 spill events counted
Northumbrian Water Crookhall Stw into Stockerley Burn, Tributary Of 33 spills, 240 hours in 2025
1.5 km away Northumbrian Water Crookhall Stw into Stockerley Burn, Tributary Of 62 spills, 164 hours in 2025
1.5 km away Northumbrian Water Butsfield Lane Cso Der092 into Smallhope Burn 46 spills, 70 hours in 2025
1.8 km away Northumbrian Water East Of Knitsley Grange Farm Cso into Smallhope Burn 18 spills, 32 hours in 2025
1.9 km away Northumbrian Water Fellside Cso (Der 174) into Backgill Burn Tributary 13 spills, 16 hours in 2025
650 m away Northumbrian Water Sixth St Sso into Stockerley Burn, Tributary Of 4 spills, 1 hours in 2025
950 m away Northumbrian Water South Street Storm Sewage Overflow into Stockerley Burn, Tributary Of 1 spills, 0 hours in 2025
1.2 km away Northumbrian Water 5 South Street Cso, Crookhall into Stockerley Burn Tributary 1 spills, 0 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 11 planned, approved or being built and 13 running (74 MW between them). Those within 5 km are on the map above.
Solar farm Hownsgill Industrial Park Being built · 5 MW
Feb 2019 1.1 km away Rooftop solar Number One Industrial Estate - Solar PV system Approved, not yet built · 320 kW
Nov 2021 2.3 km away Rooftop solar Number One Industrial Estate - Solar Panels Approved, not yet built · 1 MW
Apr 2022 2.3 km away Rooftop solar Harelaw Industrial Estate - Solar Panels Approved, not yet built · 890 kW
Oct 2023 6.0 km away Battery storage Maiden, Annfield Plain - Energy Storage Approved, not yet built · 38 MW
Aug 2021 6.0 km away Solar farm Edge Lane, Maiden Law - Solar Farm & Battery Storage Approved, not yet built · 50 MW
Apr 2026 6.6 km away Battery storage Edge Lane, Maiden Law - Solar Farm & Battery Storage Approved, not yet built · 45 MW
Apr 2026 6.6 km away Solar farm Greenhead Energy Park Planning application in · 50 MW
May 2024 7.7 km away Battery storage Greenhead Energy Park Planning application in · 13 MW
May 2024 7.7 km away Solar farm Highfield Energy Park Appeal lodged · 40 MW
Jan 2026 7.8 km away Battery storage Highfield Energy Park
Road and street works within 1 km 3 permitted works running now or planned.
Standard Buddle Street, Consett Utility asset works · NORTHUMBRIAN WATER · Give and take
Oct 2026 to Oct 2026 650 m away Standard Gill Street, Consett Utility asset works · NORTHUMBRIAN WATER · Give and take
Oct 2026 to Oct 2026 750 m away Standard Third Street, Crookhall Utility repair and maintenance works · NORTHUMBRIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jan 2021 16.9 km away Decided decided Sept 2018 25.0 km away Decided decided Jul 2020 25.3 km away Decided decided Jan 2016 28.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land Adjacent to Thomas Swan and Co Ltd. (anaerobic digestion, 1.5 km); Derwentside Environmental Testing Servs Limited - Solar pv panels (rooftop solar, 1.9 km); Greencroft Estate Turbines (wind farm, 5.0 km); Green Croft Solar Farm (solar farm, 5.8 km); Chapman's Well (landfill gas, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.