Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
275hours of spills in 2025 between them (typical neighbourhood: about 36)
71spill events counted
Northumbrian Water
Coop House Wood Csointo Coop House Dene Burn · near bathing water: Seaham Beach36 spills, 162 hours in 2025
600 m away
Northumbrian Water
Pesspool Lane Csointo Caldwell Burn11 spills, 105 hours in 2025
1.3 km away
Northumbrian Water
Conishead Terracem South Hetton Csointo Coldwell Burn, Tributary Of14 spills, 7 hours in 2025
1.5 km away
Northumbrian Water
Barwick Street Csointo Murton Dene6 spills, 1 hours in 2025
2.0 km away
Northumbrian Water
Murton Combined Sewer Overflowinto Culverted Trib Of Seaham Burn3 spills, 0 hours in 2025
2.0 km away
Northumbrian Water
Coldwell Burn Ssointo Coldwell Burn1 spills, 0 hours in 2025
1.1 km away
Northumbrian Water
Little Coop House Farm - Nwl Nameinto Culverted Section Of Coop House Beck0 spills, 0 hours in 2025
1.4 km away
Northumbrian Water
Murton Cso 15into Unnamed Watercourse0 spills, 0 hours in 2025
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
The Net Zero Teesside ProjectGenerating Stations · Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
decided Feb 2024 26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.