What's changing near DH4 4JZ
Within 2 km, around Newbottle & Penshaw in Sunderland. Building, planning, schools, transport, prices and crime.
373new homes completed within 2 km, last 2 years
72homes given permission on brownfield sites since 2021
+8.9%like-for-like prices in Newbottle & Penshaw, 2024 → 2025 (council +3.9%)
-28%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Oct 2026
planned Oct 2026
1.8 km away - New homes
5 new homes completedhouses · Oct 2025 – Oct 2026
planned Oct 2026
650 m away - New homes
38 new homes completedhouses · Nov 2025 – Oct 2026
planned Oct 2026
650 m away - New homes
9 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
600 m away - New homes
9 new homes completedhouses · Jul 2026 – Oct 2026
Oct 2026
700 m away - New homes
12 new homes completedhouses · Nov 2025 – Oct 2026
Oct 2026
700 m away - New homes
7 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
850 m away - New homes
29 new homes completedhouses · Nov 2024 – Jul 2026
Jul 2026
650 m away - New homes
12 new homes completedhouses · Apr 2026 – Jun 2026
Jun 2026
800 m away - New homes
9 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
700 m away - New homes
12 new homes completedhouses · Oct 2025 – May 2026
May 2026
600 m away - New homes
12 new homes completedhouses · Oct 2025 – Apr 2026
Apr 2026
600 m away
13homes extended 2021–2025, typically adding 25 m²
32since energy certificates began (2008)
2in DH4 4JZ itself
- Extendedcertificate 2019
- Extendedcertificate 2009
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
616hours of spills in 2025 between them (typical neighbourhood: about 36)
193spill events counted
- Northumbrian Water
Sedgeletch Stwinto Herrington Burn/Moors Burn87 spills, 283 hours in 2025
1.8 km away - Northumbrian Water
Shiney Row Footbridge Csointo Herrington Burn46 spills, 236 hours in 2025
250 m away - Northumbrian Water
66 Ross Lea Csointo Herrington Burn17 spills, 35 hours in 2025
950 m away - Northumbrian Water
Houghton Le Spring Csointo Trib Of River Wear2 spills, 21 hours in 2025
400 m away - Northumbrian Water
Sedgeletch Bridge Csointo Moors Burn17 spills, 20 hours in 2025
1.9 km away - Northumbrian Water
Westbourne Drive Csointo Herrington Burn17 spills, 19 hours in 2025
500 m away - Northumbrian Water
Bourn Lea Cso Ch087into Herrington Burn5 spills, 4 hours in 2025
900 m away - Northumbrian Water
Osman Terrace Csointo Moors Burn2 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
50 planned, approved or being built and 16 running (101 MW between them). Those within 5 km are on the map above.
- Solar farm
Sedgeletch Sewage Treatment WorksBeing built
Jan 2021
1.8 km away - Battery storage
Fox Cover Road - Battery Energy StorageApproved, not yet built · 30 MW
Sept 2024
2.8 km away - Battery storage
Hastings Hill Farm, Foxcover Road - Battery Energy StorageApproved, not yet built · 38 MW
Jul 2025
3.1 km away - Rooftop solar
Calsonic Kansei - Solar ArrayApproved, not yet built · 2 MW
Jun 2024
3.4 km away - Rooftop solar
The Cylinder Service Centre, Sedling Road - Solar PanelsApproved, not yet built · 200 kW
Sept 2025
3.6 km away - Rooftop solar
Sedling Road - Solar PanelsApproved, not yet built · 360 kW
Apr 2022
3.6 km away - Rooftop solar
Rocket Medical, Sedling Road - Solar PV SystemApproved, not yet built · 430 kW
Feb 2023
3.8 km away - Rooftop solar
Griffiths Textiles Machines, Alston Road - Solar PanelsApproved, not yet built · 700 kW
Sept 2022
4.0 km away - Rooftop solar
Evolve Business CentreApproved, not yet built · 300 kW
May 2020
4.0 km away - Battery storage
Evolve Business CentreApproved, not yet built
May 2020
4.0 km away - Rooftop solar
Road and street works within 1 km
5 permitted works running now or planned, 4 of them major.
- Major, planned
Travers Street, Houghton-Le-SpringUtility repair and maintenance works · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Dec 2026
400 m away - Major
Travers Street, Houghton-Le-SpringUtility repair and maintenance works · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Dec 2026
400 m away - Major, planned
Brentwood Road, Houghton-Le-SpringHighway improvement works · SUNDERLAND CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
950 m away - Major
Brentwood Road, Houghton-Le-SpringHighway improvement works · SUNDERLAND CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
950 m away - Standard
Council Avenue, Houghton-Le-SpringNew service connection · NORTHERN GAS NETWORKS · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026
300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jul 2020
7.6 km away - Decideddecided Sept 2018
8.3 km away - Decideddecided Jan 2021
8.4 km away - Decideddecided Jan 2016
15.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Houghton-le-Spring Landfill Site (landfill gas, 3.5 km); Lumley Water Treatment Works - Solar Panels (solar farm, 4.6 km); Nissan Wind Farm (wind farm, 5.2 km); Nissan Motors Plant Extn (wind farm, 5.2 km); Unipres building (rooftop solar, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.