Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
142hours of spills in 2025 between them (typical neighbourhood: about 36)
45spill events counted
Northumbrian Water
Belmont Stwinto Unnamed Trib. Of River Wear8 spills, 71 hours in 2025
1.4 km away
Northumbrian Water
Rennys Lane Pumping Stationinto Pittington Beck9 spills, 57 hours in 2025
1.4 km away
Northumbrian Water
Station Bank (Du21)into Pittington Beck20 spills, 13 hours in 2025
1.7 km away
Northumbrian Water
Fallsway Cso (Du57)into Wear Trib3 spills, 1 hours in 2025
750 m away
Northumbrian Water
Dragon Lane Csointo Pittington Beck Trib3 spills, 1 hours in 2025
1.4 km away
Northumbrian Water
High St Csointo Wear Trib2 spills, 0 hours in 2025
750 m away
Northumbrian Water
Devonshire Road East Csointo Tributary Of Pittington Beck0 spills, 0 hours in 2025
1.4 km away
Northumbrian Water
Devonshire Road West Csointo Tributary Of Pittington Beck0 spills, 0 hours in 2025
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
application due February 202728.7 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Belmont & Carrville: +28% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.
Hetton Commnity Pool/Wellness Centre, Welfare Road - Solar PV arrayPlanning application in · 190 kW
Sept 2024 6.0 km away
Running nearest: Mark's Quarry (landfill gas, 2.8 km); Lumley Water Treatment Works - Solar Panels (solar farm, 5.6 km); High Haswell Wind Farm (wind farm, 6.1 km); PG1-Coxhoe Waste Disposal Site (landfill gas, 7.6 km); Great Eppleton Wind Farm (wind farm, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.