What's changing near DE7 6FE
Within 2 km, around Breadsall, Little Eaton & Stanley Common in Erewash. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
5homes given permission on brownfield sites since 2021
+8.9%like-for-like prices in Breadsall, Little Eaton & Stanley Common, 2024 → 2025 (council +2.7%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
1homes extended 2021–2025, typically adding 16 m²
1since energy certificates began (2008)
0in DE7 6FE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
84hours of spills in 2025 between them (typical neighbourhood: about 36)
48spill events counted
- Severn Trent Water
Stanley Village Csointo Stanley Brook (Erewash Trib)19 spills, 48 hours in 2025
450 m away - Severn Trent Water
St Wilfrid'S Road Csointo Tributary Of Stanley Brook14 spills, 27 hours in 2025
1.7 km away - Severn Trent Water
Stanley Common - Common Lane Csointo Tributary Of Stalney Brook15 spills, 10 hours in 2025
950 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
40 planned, approved or being built and 4 running (8 MW between them). Those within 5 km are on the map above.
- Solar farm
Pinnacle Storage Park, Dale Abbey - Solar PV PanelsBeing built · 1 MW
Jan 2023
1.2 km away - Solar farm
Brunswood Farm, Locko Road - Solar PanelsApproved, not yet built · 200 kW
Jan 2024
3.0 km away - Solar farm
Boyah Grange Solar Farm, Potato Pit Lane - Solar FarmPlanning application in · 35 MW
Aug 2025
3.7 km away - Battery storage
Old Power House - Battery Energy Storage UnitApproved, not yet built
Jul 2023
3.9 km away - Rooftop solar
Lees Brook Community School, Morley Road - Solar PanelsApproved, not yet built · 210 kW
Mar 2026
4.6 km away - Rooftop solar
Solvay Composites Derby - Solar PanelsApproved, not yet built · 300 kW
May 2025
4.9 km away - Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
5.0 km away - Rooftop solar
Synesqo, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
5.0 km away - Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026
5.4 km away - Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025
5.5 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
8.9 km away - Decideddecided Aug 2023
9.0 km away - Decideddecided Jan 2016
14.5 km away - RecommendationSept 2026
14.5 km away - RecommendationSept 2026
16.2 km away - Decideddecided Dec 2014
16.4 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Manners Avenue - Solar Panels (rooftop solar, 3.9 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 6.0 km); Newthorpe Wind Turbine (wind farm, 6.5 km); Derby Sewage Treatment Works (wind farm, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.