Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
18hours of spills in 2025 between them (typical neighbourhood: about 36)
7spill events counted
Severn Trent Water
Off Church Street Csointo Bottle Brook5 spills, 18 hours in 2025
1.6 km away
Severn Trent Water
Smalley - Main Road Csointo Tributary Of Park Brook2 spills, 1 hours in 2025
1.5 km away
Severn Trent Water
Ryknield Road Csointo Bottle Brook0 spills, 0 hours in 2025
35 planned, approved or being built and 3 running (3 MW between them). Those within 5 km are on the map above.
Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026 2.6 km away
Rooftop solar
Solvay Composites Derby - Solar PanelsApproved, not yet built · 300 kW
May 2025 2.6 km away
Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025 2.7 km away
Rooftop solar
Synesqo, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025 2.7 km away
Rooftop solar
SC Johnson, Denby - Solar PanelsBeing built · 620 kW
Sept 2022 3.2 km away
Rooftop solar
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsApproved, not yet built · 4 MW
Apr 2024 3.5 km away
Battery storage
Heanor Road - Battery Energy Storage SystemApproved, not yet built · 40 MW
Feb 2025 3.8 km away
Rooftop solar
William Gregg Vc Leisure Centre, Hands Road - Solar PV PanelsPlanning application in · 230 kW
Jun 2023 3.9 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 3.9 km away
Rooftop solar
Factory Tencate Advanced Composites Limited, Amber Drive - Solar PanelsApproved, not yet built · 470 kW
Dec 2022 5.0 km away
Road and street works within 1 km
1 permitted works running now or planned.
Standard
Main Road, IlkestonUtility repair and maintenance works · SEVERN TRENT WATER · Two-way signals
Oct 2026 to Oct 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 20.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.