Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,175hours of spills in 2025 between them (typical neighbourhood: about 36)
160spill events counted
Severn Trent Water
Cossall Combined Sewer Overflowinto River Erewash37 spills, 300 hours in 2025
1.5 km away
Severn Trent Water
Kirk Hallam - Western Outfall Tank (Sso)into Nut Brook24 spills, 299 hours in 2025
700 m away
Severn Trent Water
Gallows Inn Combined Sewer Overflowinto River Erewash31 spills, 239 hours in 2025
1.7 km away
Severn Trent Water
Ilkeston - Potters Lock (Sso)into River Erewash19 spills, 168 hours in 2025
1.4 km away
Severn Trent Water
Erewash Sq Ilkeston Outlet 3 Csointo River Erewash29 spills, 165 hours in 2025
1.4 km away
Severn Trent Water
Manholesinto River Erewash16 spills, 4 hours in 2025
50 planned, approved or being built and 6 running (10 MW between them). Those within 5 km are on the map above.
Battery storage
Old Power House - Battery Energy Storage UnitApproved, not yet built
Jul 2023 1.6 km away
Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025 1.6 km away
Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022 1.7 km away
Solar farm
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in · 16 MW
Feb 2025 2.8 km away
Battery storage
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in
Feb 2025 2.8 km away
Solar farm
Pinnacle Storage Park, Dale Abbey - Solar PV PanelsBeing built · 1 MW
Jan 2023 3.2 km away
Solar farm
Boyah Grange Solar Farm, Potato Pit Lane - Solar FarmPlanning application in · 35 MW
Aug 2025 3.6 km away
Rooftop solar
Sainsburys Supermarket, Greens Lane - Solar PanelsPlanning application in · 310 kW
May 2026 5.1 km away
Rooftop solar
Hadden Court, Glaisdale Parkway - Roof Mounted Solar PanelsApproved, not yet built · 330 kW
Nov 2024 5.5 km away
Rooftop solar
Glaisdale Point, Units 10 To 12 - Roof Mounted Solar PV ArrayApproved, not yet built · 270 kW
Feb 20255.5 km away
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
Major
Darwin Avenue, IlkestonUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026 550 m away
Major
High Street, IlkestonHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Oct 2026 900 m away
Major
Little Hallam Lane, IlkestonUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026 900 m away
Standard
Stanton Road, IlkestonHighway improvement works · DERBYSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Nov 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 20.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.