Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
299hours of spills in 2025 between them (typical neighbourhood: about 36)
28spill events counted
Severn Trent Water
Kirk Hallam - Western Outfall Tank (Sso)into Nut Brook24 spills, 299 hours in 2025
48 planned, approved or being built and 6 running (10 MW between them). Those within 5 km are on the map above.
Battery storage
Old Power House - Battery Energy Storage UnitApproved, not yet built
Jul 2023 1.9 km away
Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025 2.0 km away
Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022 2.1 km away
Solar farm
Pinnacle Storage Park, Dale Abbey - Solar PV PanelsBeing built · 1 MW
Jan 2023 2.3 km away
Solar farm
Boyah Grange Solar Farm, Potato Pit Lane - Solar FarmPlanning application in · 35 MW
Aug 2025 2.7 km away
Solar farm
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in · 16 MW
Feb 2025 3.6 km away
Battery storage
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in
Feb 2025 3.6 km away
Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025 5.6 km away
Solar farm
Brunswood Farm, Locko Road - Solar PanelsApproved, not yet built · 200 kW
Jan 2024 5.7 km away
Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024 5.9 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 19.3 km away