Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
258hours of spills in 2025 between them (typical neighbourhood: about 36)
53spill events counted
Severn Trent Water
Melbourne Stw (Cso)into Carr Brook18 spills, 201 hours in 2025
650 m away
Severn Trent Water
Kings Newton - Main Street Csointo Tributary Of Ramsley Brook30 spills, 43 hours in 2025
300 m away
Severn Trent Water
Lilypool Csointo Carr Brook5 spills, 14 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Victory Park Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2022 7.7 km away
Rooftop solar
Metal Improvement Company, Ascot Drive - Solar panelsApproved, not yet built · 160 kW
Jan 2024 8.2 km away
Running nearest: East Midlands Distribution Centre (rooftop solar, 4.6 km); Walnut Yard (Phase 1) (solar farm, 4.9 km); Langley Priory, Walnut Yard (Phase 2) (solar farm, 4.9 km); East Midlands Airport (wind farm, 5.0 km); Lount/Smoile (landfill gas, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 18.7 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 22.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.