Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
146hours of spills in 2025 between them (typical neighbourhood: about 36)
88spill events counted
Severn Trent Water
Newbold Avenue Csointo Ock Brook21 spills, 62 hours in 2025
1.8 km away
Severn Trent Water
Sandringham Drive Csointo Trib Of River Derwent28 spills, 41 hours in 2025
1.3 km away
Severn Trent Water
Nottingham Road Csointo Trib Of River Derwent17 spills, 22 hours in 2025
2.0 km away
Severn Trent Water
South Of Borrowash Bypass Csointo Ock Brook22 spills, 21 hours in 2025
700 m away
Severn Trent Water
Hawthorne Avenue Csointo Ock Brook0 spills, 0 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Dunelm Mill, Ascot Drive - Solar PanelsPlanning application in · 160 kW
Apr 2023 5.6 km away
Rooftop solar
Chequers Road - Solar PanelsApproved, not yet built · 250 kW
Jun 2022 5.7 km away
Running nearest: Derby Sewage Treatment Works (wind farm, 3.0 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 6.6 km); Manners Avenue - Solar Panels (rooftop solar, 7.4 km); East Midlands Distribution Centre (rooftop solar, 7.6 km); Sinfin Lane (energy from waste, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 13.9 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 27.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.