Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
64hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
Severn Trent Water
Breaston - Risley Lane (So)into Golden Brook16 spills, 38 hours in 2025
1.5 km away
Severn Trent Water
Marlborough Road (Rear) Csointo Golden Brook5 spills, 27 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Lees Brook Community School, Morley Road - Solar PanelsApproved, not yet built · 210 kW
Mar 2026 6.4 km away
Rooftop solar
St Modwen Park, Andressey Way - Solar PanelsPlanning application in · 240 kW
May 2026 6.6 km away
Running nearest: Derby Sewage Treatment Works (wind farm, 4.9 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 5.6 km); East Midlands Distribution Centre (rooftop solar, 6.6 km); Manners Avenue - Solar Panels (rooftop solar, 7.7 km); Beeston Weir Hydro Scheme (hydro, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 15.4 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 27.9 km away
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.