Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
323hours of spills in 2025 between them (typical neighbourhood: about 36)
97spill events counted
Severn Trent Water
Ockbrook - Nooning Lane (Draycott) (Eso)into Tributary Of Cecilly Brook54 spills, 240 hours in 2025
1.4 km away
Severn Trent Water
Newbold Avenue Csointo Ock Brook21 spills, 62 hours in 2025
850 m away
Severn Trent Water
South Of Borrowash Bypass Csointo Ock Brook22 spills, 21 hours in 2025
450 m away
Severn Trent Water
Hawthorne Avenue Csointo Ock Brook0 spills, 0 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
Rooftop solar
David Lloyd Health And Fitness Centre, Riverside Road - Solar PanelsApproved, not yet built
Aug 2025 5.8 km away
Solar farm
Pinnacle Storage Park, Dale Abbey - Solar PV PanelsBeing built · 1 MW
Jan 2023 6.1 km away
Running nearest: Derby Sewage Treatment Works (wind farm, 3.0 km); East Midlands Distribution Centre (rooftop solar, 6.5 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 7.0 km); Sinfin Lane (energy from waste, 7.7 km); Manners Avenue - Solar Panels (rooftop solar, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 14.5 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 26.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.