Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
St Modwen Park, Andressey Way - Solar PanelsPlanning application in · 240 kW
May 2026 6.9 km away
Rooftop solar
Tenpin Bowling Derby, Foresters Park Centre - Solar PanelsApproved, not yet built · 190 kW
Sept 2023 7.0 km away
Running nearest: East Midlands Distribution Centre (rooftop solar, 2.5 km); East Midlands Airport (wind farm, 5.0 km); Derby Sewage Treatment Works (wind farm, 5.5 km); Sinfin Lane (energy from waste, 6.9 km); Walnut Yard (Phase 1) (solar farm, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 19.4 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 21.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.