Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
59hours of spills in 2025 between them (typical neighbourhood: about 36)
31 planned, approved or being built and 7 running (50 MW between them). Those within 5 km are on the map above.
Battery storage
Twyford Road, Twyford - Battery Energy Storage SystemPlanning application in
Apr 2026 450 m away
Rooftop solar
Toyota Solar Farm - Solar FarmPlanning application in · 16 MW
Aug 2025 2.5 km away
Battery storage
Landown Farm, Bakeacre Lane - Battery Energy Storage SystemApproved, not yet built · 40 MW
May 2025 3.0 km away
Battery storage
Derby Road, Egginton - Battery Storage FacilityApproved, not yet built · 100 MW
Jun 2025 3.3 km away
Battery storage
Stenson Lane - Battery Energy Storage SystemApproved, not yet built · 400 MW
Oct 2025 3.8 km away
Solar farm
Arleston Solar & Battery Energy Storage SystemPlanning application in · 43 MW
Jul 2025 3.8 km away
Battery storage
Arleston Solar & Battery Energy Storage SystemPlanning application in · 100 MW
Jul 2025 3.8 km away
Rooftop solar
John Port Spencer Academy, Main Street - Solar PanelsPlanning application in · 680 kW
Apr 2026 4.7 km away
Rooftop solar
Stretton Business Park, Brunel Drive - Solar PanelsApproved, not yet built
Mar 2025 5.2 km away
Rooftop solar
Pirelli Limited, Derby Road - Solar PanelsApproved, not yet built · 1 MW
Apr 2024 5.5 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major, planned
Findern Lane, WillingtonUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Claymills Sewage Treatment Works, Meadow Lane - Solar PanelsPlanning application in · 25 MW
May 2026 5.6 km away
Battery storage
Burton Enterprise Park, Hawkins Lane - Battery Energy StorageApproved, not yet built
Jul 2022 6.4 km away
Running nearest: Toyota Solar Farm (solar farm, 3.1 km); Sinfin Lane (energy from waste, 6.7 km); Bretby Power (landfill gas, 7.6 km); Rolleston Park Farm (solar farm, 8.9 km); Rolleston Park Farm, Lodge Hill - Solar Farm (solar farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Rail Freight Interchanges · 20km southwest of Nottingham, next to East Midlands Airport
Sept 2026 17.1 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 21.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.