45new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.7%like-for-like prices in Kilburn & Horsley, 2024 → 2025 (council +2.6%)
-15%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 49 m²
4since energy certificates began (2008)
0in DE5 8NP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
578hours of spills in 2025 between them (typical neighbourhood: about 36)
66spill events counted
- Severn Trent Water
Marehay Sewage Treatment Worksinto Tributary Of Bottle Brook30 spills, 429 hours in 2025
1.7 km away - Severn Trent Water
Marehay Tps (Cso)into Tributary Of Bottle Brook22 spills, 117 hours in 2025
1.7 km away - Severn Trent Water
Off Church Street Csointo Bottle Brook5 spills, 18 hours in 2025
1.2 km away - Severn Trent Water
Marehay Sewage Treatment Worksinto Tributary Of Bottle Brook8 spills, 14 hours in 2025
1.7 km away - Severn Trent Water
Kilburn - Derby Rd/Bywell Ln Csointo Bottle Brook1 spills, 0 hours in 2025
1.0 km away - Severn Trent Water
Ryknield Road Csointo Bottle Brook0 spills, 0 hours in 2025
1.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
25 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
- Rooftop solar
SC Johnson, Denby - Solar PanelsBeing built · 620 kW
Sept 2022
1.2 km away - Rooftop solar
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsApproved, not yet built · 4 MW
Apr 2024
1.6 km away - Rooftop solar
Ripley Leisure Centre, Derby Road - Solar PV PanelsApproved, not yet built · 240 kW
Sept 2023
3.4 km away - Solar farm
Derby Road - Solar PanelsPlanning application in · 38 MW
Mar 2025
3.7 km away - Battery storage
Derby Road - Battery Energy Storage SystemPlanning application in · 40 MW
Mar 2025
3.7 km away - Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023
3.7 km away - Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026
3.8 km away - Rooftop solar
Solvay Composites Derby - Solar PanelsApproved, not yet built · 300 kW
May 2025
4.2 km away - Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
4.2 km away - Rooftop solar
Synesqo, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
4.2 km away - Solar farm
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
1.8 km away - Decideddecided Aug 2023
10.7 km away - Decideddecided Dec 2014
19.7 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
20.0 km away - Decideddecided Jan 2016
21.6 km away - RecommendationSept 2026
21.6 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Manners Avenue - Solar Panels (rooftop solar, 8.5 km); Newthorpe Wind Turbine (wind farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.