103new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.7%like-for-like prices in Kilburn & Horsley, 2024 → 2025 (council +2.6%)
-15%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Apr 2026 – Sep 2026
Sept 2026
1000 m away - New homes
11 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
5 new homes completedhouses · Jan 2025 – Jun 2026
Jun 2026
1.1 km away - New homes
9 new homes completedhouses · Dec 2024 – May 2026
May 2026
950 m away - New homes
29 new homes completedhouses · Nov 2025 – Mar 2026
Mar 2026
150 m away - New homes
12 new homes completedhouses · Dec 2025 – Mar 2026
Mar 2026
100 m away - New homes
12 new homes completedhouses · Jun 2025 – Mar 2026
Mar 2026
1.6 km away - New homes
7 new homes completedhouses · Nov 2024 – Feb 2025
Feb 2025
1.4 km away - New homes
5 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 44 m²
6since energy certificates began (2008)
0in DE5 8LB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
686hours of spills in 2025 between them (typical neighbourhood: about 36)
111spill events counted
- Severn Trent Water
Marehay Sewage Treatment Worksinto Tributary Of Bottle Brook30 spills, 429 hours in 2025
200 m away - Severn Trent Water
Apollo Engineering Site Csointo Trib Of Bottle Brook45 spills, 125 hours in 2025
700 m away - Severn Trent Water
Marehay Tps (Cso)into Tributary Of Bottle Brook22 spills, 117 hours in 2025
200 m away - Severn Trent Water
Marehay Sewage Treatment Worksinto Tributary Of Bottle Brook8 spills, 14 hours in 2025
200 m away - Severn Trent Water
Ripley - Brook Lane Csointo Tributary Of Bottle Brook3 spills, 1 hours in 2025
1.1 km away - Severn Trent Water
Ripley - Derby Rd/Bowler Street Csointo Tributary Of Bottle Brook2 spills, 0 hours in 2025
800 m away - Severn Trent Water
Ripley - 158 Derby Road Csointo Marehay Brook (Tributary)1 spills, 0 hours in 2025
1.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
25 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsApproved, not yet built · 4 MW
Apr 2024
250 m away - Rooftop solar
SC Johnson, Denby - Solar PanelsBeing built · 620 kW
Sept 2022
700 m away - Rooftop solar
Ripley Leisure Centre, Derby Road - Solar PV PanelsApproved, not yet built · 240 kW
Sept 2023
1.7 km away - Solar farm
Derby Road - Solar PanelsPlanning application in · 38 MW
Mar 2025
2.1 km away - Battery storage
Derby Road - Battery Energy Storage SystemPlanning application in · 40 MW
Mar 2025
2.1 km away - Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023
2.3 km away - Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015
3.1 km away - Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026
3.3 km away - Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
3.9 km away - Rooftop solar
Synesqo, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025
3.9 km away - Rooftop solar
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
2.2 km away - Decideddecided Aug 2023
12.5 km away - Decideddecided Dec 2014
21.5 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
21.8 km away - Decideddecided Jan 2016
22.4 km away - RecommendationSept 2026
22.4 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Newthorpe Wind Turbine (wind farm, 8.2 km); Manners Avenue - Solar Panels (rooftop solar, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.