Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
686hours of spills in 2025 between them (typical neighbourhood: about 36)
111spill events counted
Severn Trent Water
Marehay Sewage Treatment Worksinto Tributary Of Bottle Brook30 spills, 429 hours in 2025
850 m away
Severn Trent Water
Apollo Engineering Site Csointo Trib Of Bottle Brook45 spills, 125 hours in 2025
250 m away
Severn Trent Water
Marehay Tps (Cso)into Tributary Of Bottle Brook22 spills, 117 hours in 2025
850 m away
Severn Trent Water
Marehay Sewage Treatment Worksinto Tributary Of Bottle Brook8 spills, 14 hours in 2025
850 m away
Severn Trent Water
Ripley - Brook Lane Csointo Tributary Of Bottle Brook3 spills, 1 hours in 2025
400 m away
Severn Trent Water
Ripley - Derby Rd/Bowler Street Csointo Tributary Of Bottle Brook2 spills, 0 hours in 2025
26 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
Rooftop solar
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsApproved, not yet built · 4 MW
Apr 2024 850 m away
Rooftop solar
Ripley Leisure Centre, Derby Road - Solar PV PanelsApproved, not yet built · 240 kW
Sept 2023 1.1 km away
Rooftop solar
SC Johnson, Denby - Solar PanelsBeing built · 620 kW
Sept 2022 1.3 km away
Solar farm
Derby Road - Solar PanelsPlanning application in · 38 MW
Mar 2025 1.5 km away
Battery storage
Derby Road - Battery Energy Storage SystemPlanning application in · 40 MW
Mar 2025 1.5 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 2.4 km away
Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015 2.5 km away
Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026 3.7 km away
Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025 4.3 km away
Rooftop solar
Synesqo, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025 4.3 km away
Rooftop solar
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major
Warmwells Lane, RipleyHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Oct 2026 150 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 24.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.