Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,566hours of spills in 2025 between them (typical neighbourhood: about 36)
238spill events counted
Severn Trent Water
Fritchley Stwinto Tribuatry Of River Amber48 spills, 461 hours in 2025
400 m away
Severn Trent Water
Dungeley Hill Csointo Downmeadow Brook45 spills, 302 hours in 2025
1.8 km away
Severn Trent Water
Ambergate Stwinto River Amber21 spills, 203 hours in 2025
800 m away
Severn Trent Water
Fritchley Stwinto Tribuatry Of River Amber52 spills, 199 hours in 2025
400 m away
Severn Trent Water
Ambergate Ps - Storm/Emergency O/Finto River Derwent30 spills, 183 hours in 2025
1.8 km away
Severn Trent Water
Ambergate Pumping Stationinto River Amber23 spills, 171 hours in 2025
1.1 km away
Severn Trent Water
Ambergate (Hagwood) Pumping Stinto River Amber19 spills, 47 hours in 2025
500 m away
Severn Trent Water
Derby Road/Newbridge Road Jct Csointo River Derwent0 spills, 0 hours in 2025
21 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Solar farm
Derby Road - Solar PanelsPlanning application in · 38 MW
Mar 2025 4.3 km away
Battery storage
Derby Road - Battery Energy Storage SystemPlanning application in · 40 MW
Mar 2025 4.3 km away
Rooftop solar
Ripley Leisure Centre, Derby Road - Solar PV PanelsApproved, not yet built · 240 kW
Sept 2023 4.5 km away
Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015 4.9 km away
Rooftop solar
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsApproved, not yet built · 4 MW
Apr 2024 5.6 km away
Rooftop solar
SC Johnson, Denby - Solar PanelsBeing built · 620 kW
Sept 2022 5.7 km away
Rooftop solar
Alfreton Leisure Centre Car Park, Church Street - Solar PanelsApproved, not yet built · 390 kW
Sept 2023 5.9 km away
Rooftop solar
Anthony Gell School, Wood Street - Solar PanelsApproved, not yet built · 200 kW
Apr 2026 7.1 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 7.2 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 7.6 km away
Solar farm
Road and street works within 1 km
7 permitted works running now or planned, 6 of them major.
Major, planned
New Road, RipleyRemedial works · SEVERN TRENT WATER · Road closure
Oct 2026 to Nov 2026 550 m away
Major, planned
New Road, RipleyRemedial works · SEVERN TRENT WATER · Road closure
Oct 2026 to Nov 2026 700 m away
Major
Fritchley Lane, BelperHighway repair and maintenance works · DERBYSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Oct 2026 750 m away
Major, planned
Chadwick Nick Lane, BelperUtility repair and maintenance works · Connect Fibre (Fibre Assets Ltd) · Road closure
Jan 2027 to Jan 2027 950 m away
Major, planned
Lynam Road, BelperUtility repair and maintenance works · Connect Fibre (Fibre Assets Ltd) · Road closure
Jan 2027 to Jan 2027 1000 m away
Major, planned
The Dimple, BelperUtility repair and maintenance works · Connect Fibre (Fibre Assets Ltd) · Road closure
Jan 2027 to Jan 2027 1000 m away
Minor
Ripley Road, BelperRemedial works · SEVERN TRENT WATER · Two-way signals
Oct 2026 to Oct 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 7.7 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.