Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
1,010hours of spills in 2025 between them (typical neighbourhood: about 36)
23 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Solar farm
Derby Road - Solar PanelsPlanning application in · 38 MW
Mar 2025 2.5 km away
Battery storage
Derby Road - Battery Energy Storage SystemPlanning application in · 40 MW
Mar 2025 2.5 km away
Rooftop solar
Ripley Leisure Centre, Derby Road - Solar PV PanelsApproved, not yet built · 240 kW
Sept 2023 2.6 km away
Rooftop solar
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsApproved, not yet built · 4 MW
Apr 2024 3.1 km away
Rooftop solar
SC Johnson, Denby - Solar PanelsBeing built · 620 kW
Sept 2022 3.2 km away
Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015 3.6 km away
Battery storage
Brook Farm, High Street - Battery Energy StorageApproved, not yet built
Dec 2023 5.3 km away
Rooftop solar
Alfreton Leisure Centre Car Park, Church Street - Solar PanelsApproved, not yet built · 390 kW
Sept 2023 6.5 km away
Rooftop solar
Heanor Gate Spencer Academy, Kirkley Drive - Solar PanelsApproved, not yet built · 700 kW
Mar 2026 6.5 km away
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 6.9 km away
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Tenter Lane, BelperNew service connection · National Grid Electricity Distribution (East Midlands) · Two-way signals
Nov 2026 to Nov 2026 350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Solvay Composites Derby - Solar PanelsApproved, not yet built · 300 kW
May 2025 7.0 km away
Rooftop solar
Composites House, Delves Road - Solar PanelsApproved, not yet built · 400 kW
May 2025 7.0 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.