Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
2,252hours of spills in 2025 between them (typical neighbourhood: about 36)
167spill events counted
Severn Trent Water
Wessington Pumping Stationinto River Amber68 spills, 1,211 hours in 2025
950 m away
Severn Trent Water
Ogston Wtw Csointo River Amber80 spills, 986 hours in 2025
1.2 km away
Severn Trent Water
Shirland - Hallfield Gate Sewage Psinto Tributary Of Alfreton Brook19 spills, 55 hours in 2025
27 planned, approved or being built and 7 running (33 MW between them). Those within 5 km are on the map above.
Solar farm
Meadow Lane Solar FarmBeing built · 20 MW
Mar 2023 3.6 km away
Rooftop solar
Alfreton Leisure Centre Car Park, Church Street - Solar PanelsApproved, not yet built · 390 kW
Sept 2023 3.7 km away
Battery storage
Hallgate Farm - Battery Energy StorageApproved, not yet built
Dec 2025 4.7 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 5.6 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 5.7 km away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 6.3 km away
Battery storage
Hurst Farm, Mansfield Road - Battery Energy Storage SystemApproved, not yet built · 100 MW
Dec 2025 6.4 km away
Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024 6.6 km away
Battery storage
Newton Wood FarmApproved, not yet built · 50 MW
Oct 2020 6.6 km away
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 7.5 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stonebroom, Shirland & Wessington: +26% over five years (2020 → 2025).
Council tax list: 150 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.