Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
1,601hours of spills in 2025 between them (typical neighbourhood: about 36)
167spill events counted
Severn Trent Water
Pinxton Sewage Treatment Worksinto River Erewash67 spills, 1,022 hours in 2025
1.4 km away
Severn Trent Water
Pye Bridge Sewage Treatment Worksinto River Erewash44 spills, 360 hours in 2025
350 m away
Severn Trent Water
Somercotes - Lower Birchwood Spsinto Tributary Of River Erewash20 spills, 110 hours in 2025
1.1 km away
Severn Trent Water
Ironville - Victoria Street Spsinto River Erewash25 spills, 81 hours in 2025
950 m away
Severn Trent Water
Somercotes - Birchwood Lane Spsinto Tributary Of River Erewash7 spills, 22 hours in 2025
1.4 km away
Severn Trent Water
Somercotes Road Csointo Trib Of The River Erewash3 spills, 6 hours in 2025
1.0 km away
Severn Trent Water
Greenhill Industrial Estate Csointo Trib Of Cromford Canal1 spills, 0 hours in 2025
35 planned, approved or being built and 8 running (32 MW between them). Those within 5 km are on the map above.
Rooftop solar
Evans Concrete Products, Pye Bridge Industrial Estate - Solar PanelsPlanning application in · 310 kW
Mar 2024 450 m away
Rooftop solar
Fairbrook House, Clover Nook Road - Solar PanelsApproved, not yet built · 1 MW
May 2024 2.1 km away
Rooftop solar
Guilford Europe, Cotes Park Lane - Solar PanelsApproved, not yet built · 2 MW
Apr 2023 2.2 km away
Rooftop solar
A G Parfett & Sons Limited, Cotes Park Industrial Estate - Solar PanelsApproved, not yet built · 270 kW
Sept 2023 2.2 km away
Battery storage
Plymouth Avenue, Pinxton - Battery Energy Storage FacilityApproved, not yet built · 200 kW
May 2024 2.8 km away
Battery storage
Wharf Road & Beaufit Lane, Pinxton - Micro Energy StorageApproved, not yet built · 200 kW
Jan 2026 3.0 km away
Solar farm
Swanwick CollieryPlanning application in · 1 MW
Jul 2015 3.7 km away
Rooftop solar
Alfreton Leisure Centre Car Park, Church Street - Solar PanelsApproved, not yet built · 390 kW
Sept 2023 4.2 km away
Solar farm
Meadow Lane Solar FarmBeing built · 20 MW
Mar 2023 4.5 km away
Rooftop solar
Eurocell Nickel, High View Road - Solar Pv SystemPlanning application in · 600 kW
Jul 2024 4.5 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Derby Road - Solar PanelsPlanning application in · 38 MW
Mar 2025 4.9 km away
Battery storage
Derby Road - Battery Energy Storage SystemPlanning application in · 40 MW
Mar 2025 4.9 km away
Running nearest: Crow Trees Farm (solar farm, 5.0 km); Twin Yards Solar Farm (solar farm, 5.4 km); Sutton Landfill Site (landfill gas, 7.3 km); Newstead and Annesley Wind Turbine (wind farm, 8.5 km); Newthorpe Wind Turbine (wind farm, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.