Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
171hours of spills in 2025 between them (typical neighbourhood: about 36)
44spill events counted
Severn Trent Water
Mickleover - Melbourne Close (Cso)into Bramble Brook10 spills, 87 hours in 2025
1.7 km away
Severn Trent Water
Mickleover - Sandown Avenue Spsinto Tributary Of Egginton Brook17 spills, 53 hours in 2025
850 m away
Severn Trent Water
So Mickleover Hs/Brierfield Way Csointo Hell Brook10 spills, 26 hours in 2025
1.2 km away
Severn Trent Water
Mickleover - Dresden Close 20 (Cso)into Bonehills Brook7 spills, 5 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 5.8 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
12 new homes completed2 flats, 10 houses · Feb 2025 – Apr 2025
Apr 2025 1.7 km away
New homes
6 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025 450 m away
New homes
10 new homes completedhouses · Oct 2024 – Apr 2025
Apr 2025 1.7 km away
New homes
7 new homes completedhouses · Dec 2024 – Jan 2025
Jan 2025 950 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 25 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Landau Forte College, Fox Street - Solar PanelsApproved, not yet built · 490 kW
Apr 2026 5.7 km away
Battery storage
Twyford Road, Twyford - Battery Energy Storage SystemPlanning application in
Apr 2026 6.0 km away
Running nearest: Toyota Solar Farm (solar farm, 3.7 km); Sinfin Lane (energy from waste, 5.1 km); Derby Sewage Treatment Works (wind farm, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 18.4 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 19.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.