Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
31hours of spills in 2025 between them (typical neighbourhood: about 36)
17spill events counted
Severn Trent Water
So Mickleover Hs/Brierfield Way Csointo Hell Brook10 spills, 26 hours in 2025
1.9 km away
Severn Trent Water
Mickleover - Dresden Close 20 (Cso)into Bonehills Brook7 spills, 5 hours in 2025
31 planned, approved or being built and 3 running (17 MW between them). Those within 5 km are on the map above.
Battery storage
Landown Farm, Bakeacre Lane - Battery Energy Storage SystemApproved, not yet built · 40 MW
May 2025 2.6 km away
Rooftop solar
Toyota Solar Farm - Solar FarmPlanning application in · 16 MW
Aug 2025 2.7 km away
Rooftop solar
John Port Spencer Academy, Main Street - Solar PanelsPlanning application in · 680 kW
Apr 2026 3.4 km away
Rooftop solar
Brackensdale Spencer Academy, Walthamstow Drive - Solar PanelsPlanning application in · 220 kW
May 2026 4.3 km away
Rooftop solar
The Bemrose School, Uttoxeter New Road - Solar PanelsApproved, not yet built · 180 kW
Jun 2026 4.4 km away
Battery storage
Twyford Road, Twyford - Battery Energy Storage SystemPlanning application in
Apr 2026 4.8 km away
Battery storage
Stenson Lane - Battery Energy Storage SystemApproved, not yet built · 400 MW
Oct 2025 5.4 km away
Solar farm
Arleston Solar & Battery Energy Storage SystemPlanning application in · 43 MW
Jul 2025 5.4 km away
Battery storage
Arleston Solar & Battery Energy Storage SystemPlanning application in · 100 MW
Jul 2025 5.4 km away
Rooftop solar
Tenpin Bowling Derby, Foresters Park Centre - Solar PanelsApproved, not yet built · 190 kW
Sept 20235.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major
Etwall Road, MickleoverWorks for road purposes · NATIONAL HIGHWAYS · Road closure
Oct 2026 to Oct 2026 500 m away
Minor
Etwall Road, MickleoverWorks for road purposes · NATIONAL HIGHWAYS · Lane closure
Oct 2026 to Oct 2026 400 m away
Minor
Etwall Road, MickleoverWorks for road purposes · NATIONAL HIGHWAYS · Road closure
Nov 2026 to Dec 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 17.0 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 17.9 km away
Recommendation
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.