What's changing near DE3 0AG
Within 2 km, around Hatton & Burnaston in South Derbyshire. Building, planning, schools, transport, prices and crime.
225new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.1%like-for-like prices in Hatton & Burnaston, 2024 → 2025 (council +2.8%)
+13%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
550 m away - New homes
15 new homes completed4 flats, 11 houses · Dec 2025 – Sep 2026
Sept 2026
550 m away - New homes
24 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
500 m away - New homes
9 new homes completedhouses · Mar 2026 – Sep 2026
Sept 2026
600 m away - New homes
13 new homes completedhouses · Apr 2026 – Jun 2026
Jun 2026
550 m away - New homes
13 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
1.2 km away - New homes
8 new homes completedhouses · May 2025 – Mar 2026
Mar 2026
1.0 km away - New homes
33 new homes completedhouses · Dec 2024 – Mar 2026
Mar 2026
1.1 km away - New homes
7 new homes completedhouses · Nov 2024 – Dec 2025
Dec 2025
1000 m away - New homes
14 new homes completedhouses · Nov 2024 – Sep 2025
Sept 2025
850 m away - New homes
13 new homes completedhouses · Nov 2024 – Aug 2025
Aug 2025
750 m away - New homes
7 new homes completedhouses · Dec 2024 – May 2025
May 2025
1.5 km away
4homes extended 2021–2025, typically adding 28 m²
7since energy certificates began (2008)
1in DE3 0AG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
171hours of spills in 2025 between them (typical neighbourhood: about 36)
44spill events counted
- Severn Trent Water
Mickleover - Melbourne Close (Cso)into Bramble Brook10 spills, 87 hours in 2025
2.0 km away - Severn Trent Water
Mickleover - Sandown Avenue Spsinto Tributary Of Egginton Brook17 spills, 53 hours in 2025
400 m away - Severn Trent Water
So Mickleover Hs/Brierfield Way Csointo Hell Brook10 spills, 26 hours in 2025
1.8 km away - Severn Trent Water
Mickleover - Dresden Close 20 (Cso)into Bonehills Brook7 spills, 5 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
28 planned, approved or being built and 3 running (17 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Brackensdale Spencer Academy, Walthamstow Drive - Solar PanelsPlanning application in · 220 kW
May 2026
3.2 km away - Rooftop solar
The Bemrose School, Uttoxeter New Road - Solar PanelsApproved, not yet built · 180 kW
Jun 2026
3.8 km away - Battery storage
Landown Farm, Bakeacre Lane - Battery Energy Storage SystemApproved, not yet built · 40 MW
May 2025
4.0 km away - Rooftop solar
Toyota Solar Farm - Solar FarmPlanning application in · 16 MW
Aug 2025
4.4 km away - Rooftop solar
John Port Spencer Academy, Main Street - Solar PanelsPlanning application in · 680 kW
Apr 2026
4.4 km away - Rooftop solar
Armadillo Self Storage, Foresters Park Centre - Solar PanelsApproved, not yet built · 230 kW
Jun 2025
5.7 km away - Rooftop solar
Tenpin Bowling Derby, Foresters Park Centre - Solar PanelsApproved, not yet built · 190 kW
Sept 2023
5.7 km away - Rooftop solar
Derbion Management Suite - Roof Mounted Solar panelsApproved, not yet built · 310 kW
Mar 2024
5.7 km away - Rooftop solar
Landau Forte College, Fox Street - Solar PanelsApproved, not yet built · 490 kW
Apr 2026
5.9 km away - Rooftop solar
Florence Nightingale Community Hospital, London Road - Solar PanelsApproved, not yet built · 740 kW
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Ladybank Road, DerbyUtility repair and maintenance works · SEVERN TRENT WATER · Multi-way signals
Oct 2026 to Oct 2026
600 m away - Minor
Kingsmuir Road, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Aug 2023
4.6 km away - Decideddecided Dec 2014
6.2 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
6.2 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
15.5 km away - Decideddecided Jan 2016
19.0 km away - RecommendationSept 2026
19.0 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Toyota Solar Farm (solar farm, 4.0 km); Sinfin Lane (energy from waste, 5.6 km); Derby Sewage Treatment Works (wind farm, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.