Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
6hours of spills in 2025 between them (typical neighbourhood: about 36)
32spill events counted
Severn Trent Water
Provident Street Csointo Cotton Brook21 spills, 4 hours in 2025
1.9 km away
Severn Trent Water
Harrington St/Holcombe St Csointo Cotton Brook3 spills, 1 hours in 2025
950 m away
Severn Trent Water
Pear Tree Roadinto Cotton Brook6 spills, 1 hours in 2025
1.8 km away
Severn Trent Water
Society Place Csointo Cotton Brook2 spills, 0 hours in 2025
1.9 km away
Severn Trent Water
Pear Tree Rd/Dairy House Rdinto Cotton Brook0 spills, 0 hours in 2025
1.3 km away
Severn Trent Water
Dale Road/Byron Street Csointo Cotton Brook0 spills, 0 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Derbion Management Suite - Roof Mounted Solar panelsApproved, not yet built · 310 kW
Mar 2024 2.7 km away
Rooftop solar
St Modwen Park, Andressey Way - Solar PanelsPlanning application in · 240 kW
May 2026 2.7 km away
Running nearest: Sinfin Lane (energy from waste, 1.3 km); Derby Sewage Treatment Works (wind farm, 3.4 km); Toyota Solar Farm (solar farm, 7.9 km); East Midlands Distribution Centre (rooftop solar, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 15.1 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 21.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.