Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
18hours of spills in 2025 between them (typical neighbourhood: about 36)
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Balfour Beatty Plant & Fleet Services, Raynesway - Solar PanelsPlanning application in · 210 kW
Jul 2022 3.0 km away
Rooftop solar
St Modwen Park, Andressey Way - Solar PanelsPlanning application in · 240 kW
May 2026 3.0 km away
Running nearest: Sinfin Lane (energy from waste, 1000 m); Derby Sewage Treatment Works (wind farm, 3.8 km); Toyota Solar Farm (solar farm, 7.6 km); East Midlands Distribution Centre (rooftop solar, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 15.3 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 20.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.