Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
Smartparc Food Hub, Evolution Way - Plot 8 Roof Mounted PV Solar PanelsApproved, not yet built
Jun 2024 2.5 km away
Rooftop solar
Victory Park Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2022 2.6 km away
Running nearest: Derby Sewage Treatment Works (wind farm, 2.1 km); Sinfin Lane (energy from waste, 2.8 km); East Midlands Distribution Centre (rooftop solar, 8.6 km); Toyota Solar Farm (solar farm, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 13.9 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 22.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.