What's changing near DE24 0RZ
Within 2 km, around Wilmorton & Alvaston Village in Derby. Building, planning, schools, transport, prices and crime.
351new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.2%like-for-like prices in Wilmorton & Alvaston Village, 2024 → 2025 (council +4.0%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
29 new homes completedhouses · Jan 2026 – Oct 2026
planned Oct 2026
800 m away - New homes
29 new homes completedhouses · Mar 2025 – Oct 2026
planned Oct 2026
1.5 km away - New homes
6 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
1.5 km away - New homes
17 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
1.5 km away - New homes
15 new homes completedhouses · Apr 2026 – Oct 2026
Oct 2026
1.2 km away - New homes
11 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
1.5 km away - New homes
12 new homes completedhouses · Jan 2026 – Sep 2026
Sept 2026
1.3 km away - New homes
11 new homes completedhouses · Apr 2026 – Sep 2026
Sept 2026
1.4 km away - New homes
16 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.4 km away - New homes
12 new homes completedhouses · Jun 2025 – Jul 2026
Jul 2026
1.5 km away - New homes
14 new homes completed2 flats, 12 houses · Mar 2026 – Jul 2026
Jul 2026
1.4 km away - New homes
24 new homes completedhouses · Dec 2024 – Jul 2026
Jul 20261.3 km away
4homes extended 2021–2025, typically adding 36 m²
14since energy certificates began (2008)
0in DE24 0RZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
492hours of spills in 2025 between them (typical neighbourhood: about 36)
100spill events counted
- Severn Trent Water
Green Lane Pumping Stationinto River Derwent53 spills, 295 hours in 2025
1.5 km away - Severn Trent Water
Alvaston Csointo River Derwent47 spills, 197 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 4 running (20 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Smartparc Food Hub, Evolution Way - Plot 8 Roof Mounted PV Solar PanelsApproved, not yet built
Jun 2024
2.4 km away - Rooftop solar
Balfour Beatty Plant & Fleet Services, Raynesway - Solar PanelsPlanning application in · 210 kW
Jul 2022
2.7 km away - Rooftop solar
Metal Improvement Company, Ascot Drive - Solar panelsApproved, not yet built · 160 kW
Jan 2024
3.0 km away - Rooftop solar
Dunelm Mill, Ascot Drive - Solar PanelsPlanning application in · 160 kW
Apr 2023
3.0 km away - Rooftop solar
St Modwen Park, Andressey Way - Solar PanelsPlanning application in · 240 kW
May 2026
3.4 km away - Rooftop solar
St Christophers Way - Solar PanelsApproved, not yet built · 350 kW
Jul 2022
3.7 km away - Rooftop solar
Victory Park Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2022
4.0 km away - Rooftop solar
Firstsource, Riverside Road - Solar PanelsApproved, not yet built · 770 kW
Mar 2024
4.1 km away - Rooftop solar
David Lloyd Health And Fitness Centre, Riverside Road - Solar PanelsApproved, not yet built
Aug 2025
4.2 km away - Rooftop solar
Armadillo Self Storage, Foresters Park Centre - Solar PanelsApproved, not yet built · 230 kW
Jun 20254.5 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Aug 2023
7.6 km away - Decideddecided Jan 2016
9.2 km away - RecommendationSept 2026
9.2 km away - Decideddecided Dec 2014
9.6 km away - RecommendationSept 2026
9.9 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
10.1 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Derby Sewage Treatment Works (wind farm, 2.1 km); Sinfin Lane (energy from waste, 4.6 km); East Midlands Distribution Centre (rooftop solar, 5.6 km); East Midlands Airport (wind farm, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.