Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
197hours of spills in 2025 between them (typical neighbourhood: about 36)
47spill events counted
Severn Trent Water
Alvaston Csointo River Derwent47 spills, 197 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
17 new homes completedhouses · Jan 2025 – Jun 2026
Jun 2026 1.4 km away
New homes
7 new homes completedhouses · Oct 2025 – Apr 2026
Apr 2026 1.7 km away
New homes
29 new homes completedhouses · Oct 2024 – Mar 2026
Mar 2026 1.8 km away
New homes
31 new homes completedhouses · Jan 2025 – Nov 2025
Nov 2025 1.8 km away
New homes
50 new homes completedhouses · Nov 2024 – Sep 2025
Sept 2025 1.8 km away
New homes
10 new homes completedhouses · Feb 2025 – Sep 2025
Sept 2025 1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 31 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Smartparc Food Hub, Evolution Way - Plot 8 Roof Mounted PV Solar PanelsApproved, not yet built
Jun 2024 3.1 km away
Rooftop solar
Florence Nightingale Community Hospital, London Road - Solar PanelsApproved, not yet built · 740 kW
Feb 2026 3.2 km away
Running nearest: Derby Sewage Treatment Works (wind farm, 2.6 km); Sinfin Lane (energy from waste, 2.6 km); East Midlands Distribution Centre (rooftop solar, 7.2 km); Toyota Solar Farm (solar farm, 9.2 km); East Midlands Airport (wind farm, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Electric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 15.6 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 21.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.