Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
23storm overflows within 2 km
97hours of spills in 2025 between them (typical neighbourhood: about 36)
138spill events counted
Severn Trent Water
Station Approach Csointo River Derwent30 spills, 61 hours in 2025
1.6 km away
Severn Trent Water
Uttoxeter New Rd 2/Stafford St Csointo Markeaton Brook21 spills, 13 hours in 2025
1.3 km away
Severn Trent Water
Great Northern Road Csointo Markeaton Brook23 spills, 5 hours in 2025
1.4 km away
Severn Trent Water
Provident Street Csointo Cotton Brook21 spills, 4 hours in 2025
100 m away
Severn Trent Water
Moreledge / Thorntree Lane Csointo Markeaton Brook11 spills, 4 hours in 2025
1.5 km away
Severn Trent Water
St Peters Street/East Street Csointo Markeaton Brook7 spills, 4 hours in 2025
1.5 km away
Severn Trent Water
Victoria Street/Friar Gate Jct Csointo Markeaton Brook2 spills, 1 hours in 2025
1.5 km away
Severn Trent Water
Meadow Road Spsinto River Derwent1 spills, 1 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 7.7 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
New-home postcodes with fewer than 5 homes are counted above but not listed. 47 postcodes nearby had new homes completed in the last two years.
Jan 2024 2.1 km away
Rooftop solar
Dunelm Mill, Ascot Drive - Solar PanelsPlanning application in · 160 kW
Apr 2023 2.1 km away
Rooftop solar
Victory Park Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2022 2.2 km away
Running nearest: Sinfin Lane (energy from waste, 1.9 km); Derby Sewage Treatment Works (wind farm, 4.5 km); Toyota Solar Farm (solar farm, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Pear Tree Road, DerbyUtility repair and maintenance works · SEVERN TRENT WATER · Multi-way signals
Oct 2026 to Oct 2026 200 m away
Standard
Dover Street, DerbyUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Oct 2026 to Nov 2026 350 m away
Standard
St James Road, DerbyUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Oct 2026 to Nov 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 14.8 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 21.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.