What's changing near DE23 6FE
Within 2 km, around Littleover West & Heatherton in Derby. Building, planning, schools, transport, prices and crime.
184new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-4.3%like-for-like prices in Littleover West & Heatherton, 2024 → 2025 (council +4.0%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New school
New school: Wren Park Primary SchoolAcademy sponsor led, primary
planned Oct 2027
150 m away - New homes
12 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
950 m away - New homes
9 new homes completedhouses · Jan 2026 – Oct 2026
Oct 2026
950 m away - New homes
27 new homes completedhouses · Jul 2025 – Jul 2026
Jul 2026
850 m away - New homes
9 new homes completedhouses · Oct 2024 – May 2026
May 2026
550 m away - New homes
17 new homes completedhouses · Feb 2026 – Mar 2026
Mar 2026
1.5 km away - New homes
6 new homes completedflats · Feb 2026
Feb 2026
1.6 km away - New homes
5 new homes completedhouses · Feb 2026
Feb 2026
1.6 km away - New homes
9 new homes completedhouses · Mar 2025 – Aug 2025
Aug 2025
850 m away - New homes
14 new homes completedhouses · Mar 2025 – Jun 2025
Jun 2025
850 m away - New homes
7 new homes completedhouses · Dec 2024 – May 2025
May 2025
1.8 km away - New homes
8 new homes completedflats · Oct 2024 – May 2025
May 2025
1.0 km away
15homes extended 2021–2025, typically adding 33 m²
34since energy certificates began (2008)
2in DE23 6FE itself
- Extendedcertificate 2015
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
113hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
- Severn Trent Water
Mickleover - Melbourne Close (Cso)into Bramble Brook10 spills, 87 hours in 2025
1000 m away - Severn Trent Water
So Mickleover Hs/Brierfield Way Csointo Hell Brook10 spills, 26 hours in 2025
1.1 km away - Severn Trent Water
Parcel Terrace Csointo Markeaton Brook1 spills, 0 hours in 2025
1.9 km away - Severn Trent Water
Derby - Littleover Lane (Cso)into Nailsworth Stream0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 3 running (17 MW between them). Those within 5 km are on the map above.
- Rooftop solar
The Bemrose School, Uttoxeter New Road - Solar PanelsApproved, not yet built · 180 kW
Jun 2026
1.5 km away - Rooftop solar
Brackensdale Spencer Academy, Walthamstow Drive - Solar PanelsPlanning application in · 220 kW
May 2026
1.9 km away - Rooftop solar
Armadillo Self Storage, Foresters Park Centre - Solar PanelsApproved, not yet built · 230 kW
Jun 2025
3.1 km away - Rooftop solar
Tenpin Bowling Derby, Foresters Park Centre - Solar PanelsApproved, not yet built · 190 kW
Sept 2023
3.1 km away - Rooftop solar
Derbion Management Suite - Roof Mounted Solar panelsApproved, not yet built · 310 kW
Mar 2024
3.3 km away - Rooftop solar
Florence Nightingale Community Hospital, London Road - Solar PanelsApproved, not yet built · 740 kW
Feb 2026
3.4 km away - Rooftop solar
Victory Park Way - Solar PanelsApproved, not yet built · 1 MW
Mar 2022
3.6 km away - Rooftop solar
Landau Forte College, Fox Street - Solar PanelsApproved, not yet built · 490 kW
Apr 2026
3.7 km away - Battery storage
Landown Farm, Bakeacre Lane - Battery Energy Storage SystemApproved, not yet built · 40 MW
May 2025
3.7 km away - Rooftop solar
Firstsource, Riverside Road - Solar PanelsApproved, not yet built · 770 kW
Road and street works within 1 km
2 permitted works running now or planned.
- Minor
Uttoxeter New Road, DerbyWorks for road purposes · NATIONAL HIGHWAYS · Lane closure
Oct 2026 to Oct 2026
450 m away - Minor
Pastures Hill, DerbyDisconnection or alteration of supply · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Aug 2023
3.0 km away - Decideddecided Dec 2014
6.0 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
6.3 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
14.7 km away - Decideddecided Jan 2016
16.4 km away - RecommendationSept 2026
16.4 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Sinfin Lane (energy from waste, 3.1 km); Toyota Solar Farm (solar farm, 5.1 km); Derby Sewage Treatment Works (wind farm, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.