Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
119hours of spills in 2025 between them (typical neighbourhood: about 36)
48spill events counted
Severn Trent Water
Mickleover - Melbourne Close (Cso)into Bramble Brook10 spills, 87 hours in 2025
1.3 km away
Severn Trent Water
So Mickleover Hs/Brierfield Way Csointo Hell Brook10 spills, 26 hours in 2025
1.6 km away
Severn Trent Water
Great Northern Road Csointo Markeaton Brook23 spills, 5 hours in 2025
1.9 km away
Severn Trent Water
Uttoxeter Old Rd/Junction St Csointo Markeaton Brook2 spills, 0 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 6.6 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Aug 2025 3.9 km away
Rooftop solar
St Christophers Way - Solar PanelsApproved, not yet built · 350 kW
Jul 2022 3.9 km away
Rooftop solar
Chequers Road - Solar PanelsApproved, not yet built · 250 kW
Jun 2022 3.9 km away
Running nearest: Sinfin Lane (energy from waste, 2.8 km); Toyota Solar Farm (solar farm, 5.6 km); Derby Sewage Treatment Works (wind farm, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Oct 2026 850 m away
Minor
Arlington Road, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 850 m away
Minor
Arlington Road, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 16.3 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 20.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.