What's changing near DE22 1JD
Within 2 km, around Darley Abbey in Derby. Building, planning, schools, transport, prices and crime.
140new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.8%like-for-like prices in Darley Abbey, 2024 → 2025 (council +4.0%)
+17%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
35 new homes completedflats · Mar 2025 – Jun 2026
Jun 2026
2.0 km away - New homes
7 new homes completedhouses · Nov 2025 – Apr 2026
Apr 2026
1.6 km away - New homes
28 new homes completedhouses · Nov 2024 – Mar 2026
Mar 2026
1.7 km away - New homes
7 new homes completedhouses · Nov 2025
Nov 2025
1.8 km away - New homes
26 new homes completedhouses · Dec 2024 – Jun 2025
Jun 2025
1.7 km away - New homes
26 new homes completedhouses · Nov 2024 – Mar 2025
Mar 2025
1.7 km away - New schoolDec 2024
450 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
27homes extended 2021–2025, typically adding 53 m²
47since energy certificates began (2008)
0in DE22 1JD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
555hours of spills in 2025 between them (typical neighbourhood: about 36)
244spill events counted
- Severn Trent Water
Kedleston Road Csointo Tributary Of River Derwent46 spills, 146 hours in 2025
1.2 km away - Severn Trent Water
Cso At Site Of Allestree Wrwinto River Derwent41 spills, 113 hours in 2025
1.1 km away - Severn Trent Water
St. Annes Close Csointo Markeaton Brook25 spills, 81 hours in 2025
1.8 km away - Severn Trent Water
Markeaton Lane Csointo Markeaton Brook12 spills, 57 hours in 2025
1.5 km away - Severn Trent Water
Leylands / Broadway 76 Csointo Markeaton Brook32 spills, 51 hours in 2025
1000 m away - Severn Trent Water
Markeaton St/Merchant St Jcn Csointo Markeaton Brook20 spills, 49 hours in 2025
1.8 km away - Severn Trent Water
Darley Abbey Csointo River Derwent25 spills, 26 hours in 2025
650 m away - Severn Trent Water
Darley Abbey Csointo River Derwent8 spills, 13 hours in 2025
650 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
28 planned, approved or being built and 3 running (17 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Wheatcroft Way - Solar PanelsApproved, not yet built · 610 kW
Apr 2022
1.6 km away - Rooftop solar
Landau Forte College, Fox Street - Solar PanelsApproved, not yet built · 490 kW
Apr 2026
2.0 km away - Rooftop solar
Brackensdale Spencer Academy, Walthamstow Drive - Solar PanelsPlanning application in · 220 kW
May 2026
2.8 km away - Rooftop solar
Derbion Management Suite - Roof Mounted Solar panelsApproved, not yet built · 310 kW
Mar 2024
2.8 km away - Rooftop solar
Chequers Road - Solar PanelsApproved, not yet built · 250 kW
Jun 2022
3.0 km away - Rooftop solar
The Bemrose School, Uttoxeter New Road - Solar PanelsApproved, not yet built · 180 kW
Jun 2026
3.1 km away - Rooftop solar
Florence Nightingale Community Hospital, London Road - Solar PanelsApproved, not yet built · 740 kW
Feb 2026
3.4 km away - Rooftop solar
David Lloyd Health And Fitness Centre, Riverside Road - Solar PanelsApproved, not yet built
Aug 2025
3.6 km away - Rooftop solar
Firstsource, Riverside Road - Solar PanelsApproved, not yet built · 770 kW
Mar 2024
3.7 km away - Rooftop solar
St Christophers Way - Solar PanelsApproved, not yet built · 350 kW
Jul 2022
4.1 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major, planned
Church Lane, DerbyUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
650 m away - Minor
Folly Road, DerbyUtility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026
900 m away - Minor
The Green, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Aug 2023
1.4 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
10.3 km away - Decideddecided Dec 2014
10.4 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
10.7 km away - Decideddecided Jan 2016
16.9 km away - RecommendationSept 2026
16.9 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Sinfin Lane (energy from waste, 5.6 km); Derby Sewage Treatment Works (wind farm, 6.2 km); Toyota Solar Farm (solar farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.