Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
18storm overflows within 2 km
574hours of spills in 2025 between them (typical neighbourhood: about 36)
293spill events counted
Severn Trent Water
Kedleston Road Csointo Tributary Of River Derwent46 spills, 146 hours in 2025
700 m away
Severn Trent Water
Cso At Site Of Allestree Wrwinto River Derwent41 spills, 113 hours in 2025
1.7 km away
Severn Trent Water
St. Annes Close Csointo Markeaton Brook25 spills, 81 hours in 2025
1.1 km away
Severn Trent Water
Markeaton Lane Csointo Markeaton Brook12 spills, 57 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 10.0 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Rooftop solar
St Modwen Park, Andressey Way - Solar PanelsPlanning application in · 240 kW
May 2026 4.3 km away
Rooftop solar
Lees Brook Community School, Morley Road - Solar PanelsApproved, not yet built · 210 kW
Mar 2026 4.4 km away
Running nearest: Sinfin Lane (energy from waste, 5.0 km); Derby Sewage Treatment Works (wind farm, 6.1 km); Toyota Solar Farm (solar farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 17.4 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 24.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.