Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
203hours of spills in 2025 between them (typical neighbourhood: about 36)
113spill events counted
Severn Trent Water
Off Stoney Gate Road Csointo River Derwent39 spills, 87 hours in 2025
1.3 km away
Severn Trent Water
Sandringham Drive Csointo Trib Of River Derwent28 spills, 41 hours in 2025
350 m away
Severn Trent Water
Anglers Lane Csointo River Derwent7 spills, 32 hours in 2025
1.3 km away
Severn Trent Water
Nottingham Road Csointo Trib Of River Derwent17 spills, 22 hours in 2025
1.1 km away
Severn Trent Water
South Of Borrowash Bypass Csointo Ock Brook22 spills, 21 hours in 2025
1.9 km away
Severn Trent Water
Hawthorne Avenue Csointo Ock Brook0 spills, 0 hours in 2025
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 12.3 km away
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Boyah Grange Solar Farm, Potato Pit Lane - Solar FarmPlanning application in · 35 MW
Aug 2025 4.3 km away
Rooftop solar
Metal Improvement Company, Ascot Drive - Solar panelsApproved, not yet built · 160 kW
Jan 2024 4.4 km away
Running nearest: Derby Sewage Treatment Works (wind farm, 1.8 km); Sinfin Lane (energy from waste, 6.4 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 7.9 km); Manners Avenue - Solar Panels (rooftop solar, 8.0 km); East Midlands Distribution Centre (rooftop solar, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 12.7 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 26.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.