What's changing near DE21 4PX
Within 2 km, around Chaddesden North in Derby. Building, planning, schools, transport, prices and crime.
9new homes completed within 2 km, last 2 years
8homes given permission on brownfield sites since 2021
+4.9%like-for-like prices in Chaddesden North, 2024 → 2025 (council +4.0%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 24 m²
22since energy certificates began (2008)
1in DE21 4PX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
1hours of spills in 2025 between them (typical neighbourhood: about 36)
5spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
36 planned, approved or being built and 3 running (13 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Lees Brook Community School, Morley Road - Solar PanelsApproved, not yet built · 210 kW
Mar 2026
1.1 km away - Rooftop solar
Wheatcroft Way - Solar PanelsApproved, not yet built · 610 kW
Apr 2022
1.7 km away - Solar farm
Brunswood Farm, Locko Road - Solar PanelsApproved, not yet built · 200 kW
Jan 2024
2.4 km away - Rooftop solar
Chequers Road - Solar PanelsApproved, not yet built · 250 kW
Jun 2022
2.4 km away - Rooftop solar
St Modwen Park, Andressey Way - Solar PanelsPlanning application in · 240 kW
May 2026
2.8 km away - Rooftop solar
Landau Forte College, Fox Street - Solar PanelsApproved, not yet built · 490 kW
Apr 2026
2.9 km away - Rooftop solar
David Lloyd Health And Fitness Centre, Riverside Road - Solar PanelsApproved, not yet built
Aug 2025
2.9 km away - Rooftop solar
Firstsource, Riverside Road - Solar PanelsApproved, not yet built · 770 kW
Mar 2024
3.0 km away - Rooftop solar
Balfour Beatty Plant & Fleet Services, Raynesway - Solar PanelsPlanning application in · 210 kW
Jul 2022
3.3 km away - Rooftop solar
St Christophers Way - Solar PanelsApproved, not yet built · 350 kW
Jul 2022
3.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Bishops Drive, DerbyUtility asset works · BT · Lane closure
Nov 2026 to Nov 2026
600 m away - Major, planned
Cromford Road, DerbyUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Dec 2026
750 m away - Minor
Shirley Road, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026
500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Aug 2023
4.2 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
10.1 km away - Decideddecided Dec 2014
11.9 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
12.2 km away - Decideddecided Jan 2016
14.5 km away - RecommendationSept 2026
14.5 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Derby Sewage Treatment Works (wind farm, 4.0 km); Sinfin Lane (energy from waste, 6.1 km); Manners Avenue - Solar Panels (rooftop solar, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.